Specifications
Brand Name :
1stess
Model Number :
EnerGeo
Place of Origin :
China
Certification :
LVD
MOQ :
1 piece
Price :
negotiable
Payment Terms :
L/C, T/T
Supply Ability :
10 containers per month
Delivery Time :
45-60 days
Packaging Details :
container
Warranty :
5 Years
Un Code :
UN38.3
Module :
51.2V 105AH
Communication Interface :
RS485, Ethernet
Rated Grid Voltage :
AC 400V
Application :
Grid-scale Energy Storage, Renewable Energy Integration, Peak Shaving
Fire System :
Yes
Cooling Type :
Air Cooling
Description

Optimize Your Energy Usage with BESS Battery Energy Storage System and 51.2V 105AH Module

Product Description:

The BESS Battery Energy Storage System is equipped with a high-performance module that delivers exceptional performance. With a voltage of 51.2V and a capacity of 105AH, this energy storage system is capable of delivering the power you need when you need it. The module is designed to discharge at a rate of 1C, ensuring that you get the maximum amount of energy from your system.

One of the key benefits of the BESS Battery Energy Storage System is its long-term durability and reliability. With a 5-year warranty, you can rest assured that your investment is protected. This system is also compliant with UN38.3 regulations, ensuring that it meets the highest safety standards.

Whether you're looking for a solution for grid-scale energy storage, renewable energy integration, or peak shaving, the BESS Battery Energy Storage System is the perfect choice. With its high-performance module, reliable operation, and long-term durability, this system provides the energy storage you need to power your operations efficiently and effectively.

So if you're looking for a 1C energy storage system that delivers exceptional performance and reliability, look no further than the BESS Battery Energy Storage System. Contact us today to learn more about this innovative solution and how it can benefit your business.

Features:

  • Product Name: BESS Battery Energy Storage System
  • ESS (Energy Storage System)
  • Rated Grid Voltage: AC400V
  • Communication Interface: RS485, Ethernet
  • Fire System: Yes
  • Module: 51.2V 105AH
  • AC Rated Power: 30-60kw
  • Home Solar Battery Storage System
  • Commercial Energy Storage Systems

Technical Parameters:

UN Code UN38.3
Warranty 5 Years
Cooling Type Air Cooling
Application Grid-scale Energy Storage, Renewable Energy Integration, Peak Shaving
AC Rated Power 30-60kw
Communication Interface RS485, Ethernet
Rated Grid Voltage AC400V
Module 51.2V 105AH
Fire System Yes
Battery LiFePo4 - 100Ah

Applications:

From office buildings and shopping malls to industrial plants and data centers, the BESS Battery Energy Storage System can be used in different scenarios. It can be used to provide backup power during power outages, peak shaving, load shifting, and renewable energy integration. The system can also be used to provide grid stabilization, frequency regulation, and other grid services.

The BESS Battery Energy Storage System is designed and manufactured in China, ensuring high quality and reliability. The system is equipped with a fire system, ensuring safety and protection. It has a discharge rate of 1C, providing high power output when needed. Moreover, the system comes with a 5-year warranty, giving customers peace of mind.

Overall, the BESS Battery Energy Storage System is a reliable and cost-effective solution for commercial energy storage systems. Its high performance, long-lasting backup power, and versatility make it suitable for various applications. Whether it's for backup power during power outages or grid services, the BESS Battery Energy Storage System is a perfect fit for different scenarios.

AC 400V BESS Battery Energy Storage System 51.2V 105AH Module Air Cooling

Send your message to this supplier
Send Now

AC 400V BESS Battery Energy Storage System 51.2V 105AH Module Air Cooling

Ask Latest Price
Brand Name :
1stess
Model Number :
EnerGeo
Place of Origin :
China
Certification :
LVD
MOQ :
1 piece
Price :
negotiable
Contact Supplier
AC 400V BESS Battery Energy Storage System 51.2V 105AH Module Air Cooling
AC 400V BESS Battery Energy Storage System 51.2V 105AH Module Air Cooling

Shenzhen First Tech Co., Ltd.

Verified Supplier
1 Years
Since 2017
Total Annual :
15000000-16000000
Employee Number :
100~150
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement