120kw Mini Manual Powder Coating Production Line For Aluminium Profiles 50W
Specification Of Vertical Powder Coating Line
Work Piece | |
Work piece name | Fridge, air conditioner, car parts and so on |
Work piece max size | 2500*800*2000mm (L*W*H) |
Front door size | 2400*2440mm (W*H) |
Max weight per hanger | 200kg/hanger |
Pre-treatment System | |
Material for pre-treatment | Stainless steel SUS 304 |
Working process: | Pre-degreasing --- degreasing --- water washing 1 --- pure water washing 2 --- nano ceremic --- water washing 1 --- pure water washing 2 |
Water Drying Oven | |
Size | 30000*1550*6650mm ( L*W*H ) |
Material | 100mm rock wool panel for the oven temperature 120 Celsius |
Heating system | 1 set natural gas burner, 430000kcal/h, with 1 set 7.5kw high temperature fan. |
Powder Coating Booth | |
Size | 7000*2000*3350mm (L*W*H) |
Powder recycle system | One cyclone system, 1 set 30kw circulation fan, 24 pieces filter cartridge, 2 sets of automatic reciprocators, automatic gun, manul powder coating gun |
Application Of Vertical Powder Coating Line
Coating Production Line Advantages
Efficiency
Automated powder coating lines use conveyor systems to transition parts from stage to stage of the automated system. Companies can choose to automate all or part of the powder coating process for better control and quality assurance. Some businesses need to manually control part of the process to accommodate customer requests. Automated systems setups can accommodate both routine production demands and improve turnaround times for special requests.
Traditional spray booths can only move a limited number of parts through the process. Automation takes the legwork out of the process for better efficiency across the board.
1. What should we provide if interested in your equipment ?
A. The material/size(max)/weight(max)of your workpieces.
B. What is the expected output of this equipment (8 hours/day,or 30 days/per month )?
C. The available workshop space which you plan to place this set of equipment(in LxWxH) ?
D. What fuel do you prefer to use for heating system:Electric,Gas,LPG,Diesel or others?
2. How to install equipment after purchasing your equipment ?
A. We will provide installation documents ,3D assembling drawing or installation video to guide the installation work.
B. Our engineer will guide the equipment's installation and debugging on line.
C. We can arrange installers to your factory to guide the installation work if needed,this service is chargeable.
D. After the debugging, will provide complete training and track the equipment's usage regularly.
3. How is your company's after-sales service done?
A. 1 year parts warranty, parts mainly include fans,burners,electric components of control cabinet,metal structure,wall panels etc,except the case of man-made damage.
B. As long as you have been using our equipment, our technical support will always be online