Specifications
Brand Name :
ABD
Certification :
CE
Place of Origin :
Guangdong,China
MOQ :
1 set
Price :
Negotiation
Supply Ability :
10 Sets per month
advantage :
high efficiency and lower cost,saving powder
Key component parts :
PLC,motor,pump,coating powder booth and so on
Coating :
Powder Coating
Applicable Industries :
Construction projects, manufacturing facilities, retail establishments, and shops that repair machinery
Manufacture time time :
4 months
Voltage :
380~440V, 110V/220V, or Customers Local Voltage, 50~60H
Dimension(L*W*H)) :
about 45x24x13.5 meters
After-sales service provided :
Engineers on hand to repair gear abroad
Description

ABD Powder Colouring Coating Line CE Certification Production Equipmenet

Project specifications

Colour Coating Line With V Shaped Powder Coating Booth For Aluminium Profiles

This proposal is designed for aluminum profiles vertical powder coating line—One Booth

1,Design data

A, Coating Material : Aluminum Profile

B, Technical Description:Loading ,pre-treatment ,drying , powder coating, Curing ,unloading .

C, coating profile specifications:

a. Max size of the profile : 100mm×200mm×L7000mm

b. Max Weight of the profile: 30KG

c. Standard weight : 3.5kg

d. Standard surface area of the profile : 400m2/T

e. Conveyor speed 1200mm/min (500mm/min ----- 20000mm/min adjustable )

2, Energy supply

A,Power supply

Single-phase voltage:220V+10%

Three-phase voltage:380V+10%

Frequency:50Hz

Equipment group line and zero line

B,Natural gas

3,compressed air

A,pressure : 7.0bar

B,Max steam flux: 1.3g/nm3

C,Max oil content: 0.01ppm

D,Max Flux of the compressed air: 8m3/min

4,Industrial water required

A,Pressure : 3+0.2bar

B,Flux; 5m3/h

5,Pure water

A,Conductivity : 10us/cm

B,Flux; 4m3/h

6,Powder

A,Powder characteristic : LEL≥40g/Nm3

7,Space between material hanging : 66mm,100mm,133mm,150mm,200mm

8,Production Capacity

Conveying chain speed: 1.2m/minute

Total coating pcs per hour: 1200mm/minute÷150mm/pcs×60minutes=480pcs/hr

Total weight per hour:480pcs×3.5kg/pcs =1.68tons/hr

Daily capacitly: 1.68tons x 16 hrs/day = 26.8 tons/day

Monthly Capacity: 26.8 tons/day × 25 days/month= 670 tons/month

9,Energy consumption reference for powder coating

Max Energy Consumption of Common Powder Coating

No.
Equipment Names
Electric
Natural Gas
Water
Pure wate
1

Conveyor system

4KW
2

Pre-treatment

75KW

5m3/H

4m3/H

3

Drying oven

15KW

31m3/H

4

Powder coating system

60KW

5

Curing Over

35KW

65m3/H

Total

189KW

96m3/H

5m3/H

4m3/H

About Us

Foshan Anbang De Mechanical Equipment Co., Ltd. (formerly Dali Hongwei Aluminum Industry Co., Ltd. in Nanhai District, Foshan City) was established in 1996 and changed to Foshan Anbang De Mechanical Equipment Co., Ltd. in 2012. The company is located in Fanhu Economic Development Zone, Leping Town, Sanshui District, Foshan City. It covers an area of 50 acres and has a building area of 25000 square meters, with approximately 230 people. Its main products include a fully automatic vertical electrostatic powder spraying production line for aluminum profiles, a fully automatic vertical oxidation coloring electrophoresis production line for aluminum profiles, and a fully automatic vertical fluorocarbon spraying production line for aluminum profiles.

High Efficiency ABD Powder Colouring Coating Line For Construction Projects CE Certification

FAQ

Q1: Are you trading company or manufacturer ?
A1: We are factory and can do the exporting work by ourselves.

Q2: How long is your delivery time?
A2: About 50 workdays after received the deposit.

Q3: What is your terms of payment ?
A3: T/T and Irrevcoable L/C. 30% T/T in advance, 70% balance before shippment.

Q4: Can engineers service overseas?
A4: Yes, totally no problem.

Q5: What about the guarantee period?
A5:You will have 12 months guarantee time for the powder coating booth, if the parts broken as our mistake, we will send you by DHL.


But as we do the pre install before the laoding, so this situation won't very easy to happen we believe.


After one year, if you still have any help about the equipment, please feel free to contact us at any time, as we will supply you lifelong service.

Send your message to this supplier
Send Now

High Efficiency ABD Powder Colouring Coating Line For Construction Projects CE Certification

Ask Latest Price
Brand Name :
ABD
Certification :
CE
Place of Origin :
Guangdong,China
MOQ :
1 set
Price :
Negotiation
Supply Ability :
10 Sets per month
Contact Supplier
High Efficiency ABD Powder Colouring Coating Line For Construction Projects CE Certification

Foshan ABD Equipment Co., Ltd.

Verified Supplier
3 Years
guangdong, foshan
Since 2003
Business Type :
Manufacturer, Importer, Exporter, Trading Company, Seller
Total Annual :
47,000,000.00-80,000,000.00
Employee Number :
150~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement