Specifications
Brand Name :
ABD
Certification :
CE
Place of Origin :
Guangdong, China
MOQ :
1 set
Price :
Negotiation
Supply Ability :
10 Set/Sets per Month
Treatment material :
Aluminium alloy profile and realtional products
Product Type :
Horizontal powder coating production line
Coating :
Powder Coating
Applicable Industries :
Construction projects, manufacturing facilities, retail establishments, and shops that repair machinery
Weight (KG) :
500
Application :
Easy to utilize
Keywords :
Equipment for Spraying Paint
Dimension(L*W*H)) :
about 45x24x13.5 meters
After-sales service provided :
Engineers on hand to repair gear abroad
Description
Project specifications

This proposal is designed for aluminum profiles horizontal powder coating line—One Booth

1,Design data

A, Coating Material : Aluminum Profile

B, Technical Description:Loading ,pre-treatment ,drying , powder coating, Curing ,unloading .

C, coating profile specifications:

a. Max size of the profile : 100mm×200mm×L7000mm

b. Max Weight of the profile: 30KG

c. Standard weight : 3.5kg

d. Standard surface area of the profile : 400m2/T

e. Conveyor speed 1200mm/min (500mm/min ----- 20000mm/min adjustable )

2, Energy supply

A,Power supply

Single-phase voltage:220V+10%

Three-phase voltage:380V+10%

Frequency:50Hz

Equipment group line and zero line

B,Natural gas

3,compressed air

A,pressure : 7.0bar

B,Max steam flux: 1.3g/nm3

C,Max oil content: 0.01ppm

D,Max Flux of the compressed air: 8m3/min

4,Industrial water required

A,Pressure : 3+0.2bar

B,Flux; 5m3/h

5,Pure water

A,Conductivity : 10us/cm

B,Flux; 4m3/h

6,Powder

A,Powder characteristic : LEL≥40g/Nm3

7,Space between material hanging : 66mm,100mm,133mm,150mm,200mm

8,Production Capacity

Conveying chain speed: 1.2m/minute

Total coating pcs per hour: 1200mm/minute÷150mm/pcs×60minutes=480pcs/hr

Total weight per hour:480pcs×3.5kg/pcs =1.68tons/hr

Daily capacitly: 1.68tons x 16 hrs/day = 26.8 tons/day

Monthly Capacity: 26.8 tons/day × 25 days/month= 670 tons/month

9.Main Vertical powder spraying operating procedures is as follows:

1,For profile powder spraying, pre-treatment is extremely important. A layer of natural oxide film is formed on the surface of the extruded profile with certain oil stains and sundries, which must be cleaned by chemical treatment before spraying.

2,Pre-processing processSkim ---【 1.5-5 minutes 】 ---washed 【0.5-1 minute 】--- washed 【0.5-1 minute 】--- acid surface adjustment 【1.5-5 minutes - --washed 【0.5-1 minute 】---washed 【 0.5-1 minute 】--- sharpen 【0.5-2 minutes 】--- washing【 0.5 --1 min 】-- Pure water wash 【1-- 2 min】.

3,Degreasing purpose:The purpose of degreasing treatment is to remove the oil stain on the surface of the profile and ensure the surface cleanliness when the profile enters the chroming tank.

4,Degreasing tank process parameters:During production, analyze the concentration of free acid tank liquid every two hours, adjust the tank liquid according to the analysis results, and clean the tank liquid surface from time to time without changing the tank liquid.

5,Acid Surface Conditioning Purpose:The main purpose of acid surface treatment is to further remove oil from the profile, so that the surface of the profile exposes a fresh matrix, so as to facilitate the smooth chroming reaction.Analyze the concentration of the bath solution every two hours and adjust according to the analysis results. Under normal circumstances, the bath liquid does not need to be replaced and can be used for a long time.

6,Purpose of chroming tank:It is very important for aluminum spray chroming tank. The surface of the chromed profile will form a light yellow chemical conversion coating. Weather rability of sprayed profiles.Analyze the abnormality of the bath liquid every two hours, and make adjustments according to the analysis results. Generally, the bath liquid is replaced every 2,000 tons of production, and the bath liquid is replenished from time to time.

7,The chromed profiles enter the drying furnace for surface drying. The drying temperature should be between 80 and 90 degrees, and should not exceed 95 degrees, otherwise the quality of the adhesion between the coating and the profiles will be affected.

8,The dried profiles enter the spray booth at a chain speed of 1—2.5/m for spraying(The chain speed is adjustable according to the needs of customer).

9,Through the cleaned and filtered air pressure [7-8 kg], the powder is evenly sprayed on the work pieces with the electrostatic powder gun; the electrostatic voltage of 45-90kw and the corresponding powder supply system and parameters to ensure that the coating reaches the set After the process requirements, the spraying process is completed.

10,After spraying, enter the curing furnace for leveling curing. The curing temperature is between [195-215 degrees], and the curing time should be between [15-25 minutes].

11,The profiles that have been cured and released are heated as a whole. Do not touch the surface of the profiles with bare hands. After cooling, they can be removed from the shelf. After removing the shelf, check the sprayed products. The surface must be smooth and the coating should be uniform. marks, orange peel, and other phenomena, and then can be packaged after passing professional quality inspection.

About Us

Foshan ABD Equipment Co., Ltd was founded in 2003. Since we started, ABD has been doing great work on design, manufacturing, and installation of aluminum surface treatment equipment, including electrostatic powder coating lines, anodizing and coloring lines as well as fluorocarbon liquid painting lines. We will create customized designs and provide the vertical and horizontal types for each customer based on their individual needs.

Full-automatic System CE Certification Aluminium Profiles Horizontal Powder Coating Line

FAQ

1. What should we provide if interested in your equipment ?
A. The material/size(max)/weight(max)of your workpieces.
B. What is the expected output of this equipment (8 hours/day,or 30 days/per month )?
C. The available workshop space which you plan to place this set of equipment(in LxWxH) ?
D. What fuel do you prefer to use for heating system:Electric,Gas,LPG,Diesel or others?


2. How to install equipment after purchasing your equipment ?
A. We will provide installation documents ,3D assembling drawing or installation video to guide the installation work.
B. Our engineer will guide the equipment's installation and debugging on line.
C. We can arrange installers to your factory to guide the installation work if needed,this service is chargeable.
D. After the debugging, will provide complete training and track the equipment's usage regularly.


3. How is your company's after-sales service done?
A. 1 year parts warranty, parts mainly include fans,burners,electric components of control cabinet,metal structure,wall panels etc,except the case of man-made damage.
B. As long as you have been using our equipment, our technical support will always be online

Hope our warm company can meet friendly you and bring you a different experience.

Send your message to this supplier
Send Now

Full-automatic System CE Certification Aluminium Profiles Horizontal Powder Coating Line

Ask Latest Price
Brand Name :
ABD
Certification :
CE
Place of Origin :
Guangdong, China
MOQ :
1 set
Price :
Negotiation
Supply Ability :
10 Set/Sets per Month
Contact Supplier
Full-automatic System CE Certification Aluminium Profiles Horizontal Powder Coating Line

Foshan ABD Equipment Co., Ltd.

Verified Supplier
3 Years
guangdong, foshan
Since 2003
Business Type :
Manufacturer, Importer, Exporter, Trading Company, Seller
Total Annual :
47,000,000.00-80,000,000.00
Employee Number :
150~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement