project | Test Results | |||
A Component | B Component | after mixing | ||
Color and Viscosity | white paste | black paste | Black non-flowing paste | |
proportion | 1.35 | 1.03 | 1.33 | |
Main agent, catalyst by weight 12:1(Volume ratio 9:1)after mixing | ||||
Construction time(ºC,50%RH) | 20-40minute | |||
Dry time(ºC,50%RH) | 80-100minute | |||
Corrosive | none | |||
After curing - at temperature25ºC,7 days after construction at 50% relative humidity | ||||
project | result | |||
Hardness (Shore A) | 40 | |||
12.5%Tensile modulus at elongationMPa | 0.17 | |||
ultimate tensile strengthMPa | 0.93 | |||
Ultimate Elongation (Break) | 150% |