1.Q: Could you please design a new and unique prefab pool for me? A: Absolutely! We are able to provide you with not only construction scheme, but landscape design! One-stop service is our outstanding superiority with no doubt.
2.Q: How could I ensure the cost of building a prefab pool? A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
3.Q: How Long does it take to build steel structure prefab pool? A: It depends on the size of the pool. Generally, one 20 square meter pool three workers 3 days finished installation, save manpower and time
4.Q: Is it difficult to build a prefab pool? A: Totally not, you can build the pool independently according to the construction drawings as long as you know how to use an electric tool.
5.Q: what are the advantages of prefab pool compared to the traditional building? A: There is no need for complicated civil engineering, and it does not require a lot of time for installation steps such as swimming pool waterproofing.
6.Q: What is the delivery time? A: Delivery time depends on order quantities. Generally, the delivery time will be 15-25 days after receiving the deposit.