450gsm~550gsm Industrial Filter Cloth PPS Needle Felt Filter Cloth roll for Filter Bag:
Description:
PPS filter bags are used for higher temperature applications with a maximum continuous operating temperature of 160ºC.
PPS filter bags raw material is made of Japan Toray PPS high quality fiber and produced by Germany equipment to loosening, needle punching.
Technical Specification:
Fibre | PPS |
Scrim | PPS |
Weight(G/M2) | 500~550 |
Thickness (mm) | 2.2 |
Width (mm) | ≤ 2.2 |
Length | 50m/roll |
Finish treatment | Singeing, Calendering,oil&water repellent or with PTFE membrane treatment. |
Air permeability (L/dm2/min): | 130 |
Tensile strength (N/5× 20cm) | Warp:>1200 Weft:>1300 |
Tensile elongation (%): | Warp:<30 Weft:<30 |
Temperature (ºC): | Continue: 150 Instant: 192 |
Anti-acid | Excellent |
Anti-alkali | Excellent |
Anti-abrasion | Excellent |
Hydrolytic stability | Excellent |
Our company can provide different kinds of PPS filter bags according to the customer's demands as follow:
1. PPS filter bags
2. PPS water and oil repellent filter bags
3. PPS+PTFE scrim filter bags
4. PPS+PTFE blending filter bags
5. 30%PPS,70%PTFE filter bags
6. 50%PPS,50%PTFE filter bags
7. 70%PPS,30%PTFE filter bags
Applications:
Coal - Fired Boilers bag houses Calciners / Catalysts.
Municipal Solid Waste Boilers and Waste incinerator.
Electric power plant Electrolysis and other Specialty membranes.
Waste to energy Iron and non ferrous Metal Industry.
Features:
1. High efficient filtration level.
2. Depth type filtration.
3. Wide range of chemically compatible media.
4. High temperature resistance.
5. High flow efficiency.
6. High air to cloth ratio.
7. Various coatings are available.
Making method:
Our bags are sewn with 3 - needle chain stitch to ensure seam integrity. Top constructions consist of snap band, flange top, ring top, soft cuffs or raw edge. Bottom removal bags are constructed with a raw top or soft cuff. Top and bottom removal bag bottoms have disc bottoms that are sewn using an overlock (surge) stitch or lock stitch. A wear strip or custom skirts is attached to the bottom portion of the bag to prevent premature wear from bag-to-bag and bag-to-cage abrasion.
oducing Process:
Install Diagram:
Applications:
More Production:
Packaging & Delivery:
Foreign Trade Team:
Exhibization:
Customer Visit:
Certificate:
Competitive Advantages:
1. 100% custom pass guaranteed.
2. Our products have been exported to Germany, Norway, Poland, Finland, Spain, UK, France, Russia, USA, Brazil, Mexico, Australia, Japan, Korea, Thailand, Indonesia, Uruguay and many other countries.
3. Flexible and Untraceable payment terms.
4. Good after-sale service.
5. We offer high quality products at competitive price in quick delivery
Shipping Details:
SHIPPING (Normally arrive port time in working days) | ||||
Destination | Express/Courier | SHIP BY SEA | SHIP BY AIR | SHIP BY EMS |
DHL/FEDEX/UPS/TNT | ||||
North America | 3~7 days | 15~24 days | 5~7 days | 10~12 days |
South America | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
European Countries | 3~7 days | 20~30 days | 5~7 days | 10~12 days |
Africa Countries | 3~7 days | 40~50 days | 5~7 days | 10~12 days |
The Middle East | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
Australia | 3~7 days | 10~15 days | 5~7 days | 10~12 days |
FAQ:
Q1. What is your terms of payment?
A: T/T will usually be accepted,details could be negotiated.
Q2. What is your terms of delivery?
A: FOB, CFR, CIF, DAP, FCA, EXW
Q3. How about your delivery time?
A: Generally, it will take 10to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q4. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q5. What is your sample policy?
A: We could offer the sample for free charge but do not pay the cost of freight.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
A:2. We respect every customer as our friend and we sincerely do business and make friends with them.
Generally, It will take 10 to 20 days after receiving your advanced payment. The specific delivery time depends on your items and quantity of your order.