Stainless Steel 304 Cabinet Static Laboratory Clean Room Pass Box With UV Light
Instructions:
Pass box managed according to the cleanliness level of the higher-level clean area connected to it. For example, the pass boxconnected between the spray booth and the filling room should be managed according to the requirements of the filling room. After work, the operator in the clean area is responsible for wiping the internal surfaces of the pass box and turning on the UV sterilization lamp for 30 minutes.
1. Material entering and leaving the clean area must be strictly separated from the flow channel and accessed by the material-specific channel of the production workshop.
2. When the material enters, the original auxiliary materials are unpacked or cleaned by the person in charge of the preparation process, and then sent to the temporary storage room of the workshop through the pass box; after the outer packaging is removed from the external storage, the inner packaging material is The pass boxis sent to the inner bag. The workshop integrator handles the material handover with the person in charge of the preparation and internal packaging process.
3. When passing through the pass box, the rules for "opening and closing" of the inner and outer doors of the pass boxmust be strictly enforced, and the two doors cannot be opened at the same time. After opening the outer door, put the material into the door, then close the door, then open the inner door to take out the material, close the door, and so on.
4. When the materials in the clean area are delivered, the materials should be transported to the relevant material intermediate station and removed from the clean area according to the reverse procedure when the materials enter.
5. All semi-finished products are shipped from the clean area and are sent from the pass boxto the external temporary storage room and transported to the outer packaging room via the logistics channel.
6. Materials and wastes that are highly susceptible to pollution should be transported from their dedicated transfer windows to non-clean areas.
7. After the material enters and exits, the site and the window of the intermediate station and the pass boxshould be cleaned in time, and the inner and outer access doors of the pass boxshould be closed to clean and disinfect.
Technical Parameters:
Profile Size(W*D*H)(mm) | 685*500*590 | 785*600*690 | 935*750*840 |
Within Size(W*D*H)(mm) | 500*500*500 | 600*600*600 | 750*750*750 |
Material of Cabinet | Cold Plate Spray/Stainless Steel | Cold Plate Spray/Stainless Steel | Cold Plate Spray/Stainless Steel |
Material of Wall | Stainless | Stainless | Stainless |
Thickness(mm) of Plate | 1.0/1.2 | 1.0/1.2 | 1.0/1.2 |
Transparent Laminated Glass Size(mm) | 350*350*8 | 395*395*8 | 480*480*8 |
Power Supply | 220V/50Hz | 220V/50Hz | 220V/50Hz |