Product Description:
Butt Weld Straight DN50 sch40 ASTM A234 WPB Reducing Tee Carbon Steel Pipe Fittings
butted weld reducing tee , a234 wpb reducing tee ; DN50 sch 40 Reducing tee carbon steel pipe fittings
Porduct Name | Butt weld straight tee |
Size | 1/2"-24" seamless,26“-110”welded |
Standard | ANSI B16.9,MSS SP 43, DIN2615, EN10253, GOST17376, JIS B2313, MSS SP 75, etc. |
Wall thickness | STD, XS, XXS, SCH20,SCH30,SCH40, SCH60, SCH80, SCH160, XXS and etc. |
Type | Equal/Straight tee,reduced tee,Y tee,lateral tee,Barred tee,split tee,tee cross |
End | bevel end/BE/buttweld |
Surface | nature color, varnished, black painting, anti-rust oil etc. |
Material | Carbon steel: A234WPB, A420WPL6 St37,St45, E24, A42CP, 16Mn, Q345, P245GH, P235GH, P265GH, P280GH,P295GH,P355GH and etc. |
Pipeline steel: WPHY42, WPHY52, WPHY60, WPHY65,WPHY70, WPHY80 and etc. | |
Cr-Mo allo steel: P11,P22,P5, P9,P91, 10CrMo9-10, 16Mo3 etc. | |
Application | Petrochemical industy;avation and aerospace industry;pharmaceutical industry;gas exhaust; power plart; ship buliding;water treament,etc. |
Advantages | ready stock,faster delivery time;available in all sizes,austomized;high quality |
WHAT CAN WE DO FOR YOU?
1. Factory outlet price;
2. Small order is acceptable, even 1 pc;
3. Samples are free and the cost will be returned when placing bulk orders;
4. Fast delivery within 15 days;
5. 100% inspection for all the products;
6. Refundable in case of bad quality;
7. Quick response at any time;
8. After sale service 24/7.
FAQ
How long is your delivery time?
Reply:Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity
Do you provide samples ? is it free or extra ?
Reply:Yes, we could offer the sample for free charge but do not pay the cost of freight.