Product name: Water Heat Sink Battery Cooling 5mm Thickness Aluminum Cooling Plate
1. Description of aluminum cooling plate
Processing steps: Cold stamping - cleaning - spray flux - fixture clamp the product into the brazing furnace - brazing furnace after more than a dozen procedures (automatic heating/insulation/cooling/welding, etc.) - do full inspection of air tightness test - cleaning (mainly for welding cleaning, polishing, drying) a total of more than 20 procedures.
2. Products introduction:
1). Specification: We can do various sizes as per customer's requirements
2). Alloy Code: 3003/6061/6063 or other series aluminum alloy
3). Surface treatment: anodizing ,polishing, turning ,coating, mill finish etc
4). Design: OEM, ODM, or we ourselves can also provide design service
5). Equipment: CNC, extruding machine, cold drawn machine, heating oven, straightening machine,cutting machine
6). Team Support: Professional design team, technology team and sales team
3. We are supplying the thermal management service for the following batteries:
1). Cylindrical Battery
2). Soft Packing Battery
3). Square Battery
4). New energy enterprise Battery Package Liquid Cooling Project
4. Main mechanical properties of aluminum cooling plate and cooling system:
Alloy Code | temper | Tensile Strength Rm(MPa) | Yield Strength Rp0.2(Mpa) | Extend Ratio A50(%) |
TR-010,TR-020,TR-030,TR-040,TR-050,TR-110,TR-310,TR-116,TR-316,TR-111,TR-313,TR-121,TR-131,TR-141,TR-150,TR-151,TR-156 Etc. | O | 95-135* | ≥35* | ≥15* |
H14 | 140-185 | ≥125 | ≥1.5 | |
H24 | 140-185 | ≥125 | ≥3.0 | |
H16 | 185-225 | ≥160 | ≥1.0 | |
H18 | ≥185 | - | ≥0.5 | |
TR-166 Etc.plate material | H24 | 185-235 | ≥150 | ≥8 |
TR-116,TR-316 Etc.plate material | H14 | 140-185 | ≥125 | ≥3 |
H24 | 140-185 | ≥125 | ≥8 |
5. FAQ:
Q: Are you a trading company or manufacturer?
A:Yes, we are a factory with more than 10 years history in this industry.
Q: What is your terms of payment ?
A: Normally 30% TT in advance, balance paid before shipment.
Q: How long does it take for samples and mass production?
A: Usually it will take 15-20 days for new moulds and free samples (within 5 kgs);
after confirmation, 25-30 days for mass production.
Q: OEM/ODM available?
A: Yes, we can!
Q: Could you provide sample?
A: Yes, We are honored to offer you samples for quality check.
Q: What is the lead time of sample?
A: There are several different situations:
Immediately when you need it if we have it in stock;
1~2days if no stocked sample and the sample structure is not complex;
3~5days if no stocked sample and the sample is with complex structure