Stainless steel 304 Threaded Tube 13977b CNC machining parts used for tap Customized accepted diameter 15mm
Description:
This product is a common part used in tap for our current customers, but we could make a difference according to customer's drawing so that it can fully matched with demand.
All machining processes will be adjusted by our engineers, normally we provided samples first for confirmation.
Parameters:
product name | Threaded tube |
application | kitchen tap |
diameter | D15 |
tolerance | proceed as Standard GB/T 1800.1-2009 IT12 |
raw material | Stainless steel tube |
surface | no burs |
length | 74mm |
thread | M14x1 |
thread checking | go gauge |
chamfering | C0.2/C0.5/C1 |
Order procedure:
1. receiving drawing
2. confirm details and make improvements
3. sample order (sample is free of charge, freight collected)
4. making samples
5. sample for confirmation and delivery
6. purchase order for mass production
7. deposit for order
8. mass production
9. shipment
Advantages:
1. Wide range stainless steel planter shape and dimension, more Choice.
2. Professional, experienced production staff to provide excellent quality.
3. Strong capacity, make sure fast delivery.
4. Lot production and raw materials resources make good price.
5. OEM bespoke fabrication and design team meet your special demand.
Factory Strength
1. Strong and Advanced Equipment
2. 20 Years of Casting Experience to Provide One-Stop Service
3. Advanced process standard system
4. 9 Steps of Tedious Process German standard casting
5. Senior Team with Multiple Honors
Packaging & Delivery:
Packaging Details: Neutral packing or as per customer's requirements. Inner box, outer carton and pallet
Port: Foshan Shunde,China
Lead time:
Qty | 1-1000 | 1001-10000 | >10000 |
Estimated time(days) | 10 | 20 | To be negotiated
|
After-sale service
FAQ:
Q1: How long can I expect to get the sample?
A1: After you pay the samples charge and send us confirmed files, the samples will be ready in 1-5 days for the regular specification. Or it will take about 15 days to produce new samples. The samples will be sent to you via express and arrive in 3-5 days. You can use your own express account or prepay us if you don't have an account.
Q2: What about the lead time for mass production?
A2: Honestly, it depends on the order quantity and your specific requirements of products.