SS303 Stainless Steel Connector 13965b Dia.10.5mm CNC machining parts M8X1 customized accepted
Parameters:
product name | Connector |
application | kitchen tap |
diameter | D10.5 |
tolerance | proceed as Standard GB/T 1800.1-2009 IT12 |
raw material | Stainless steel tube |
surface | no burs |
length | 20mm |
chamfering | C0.3/C0.5 |
thread | M8x1 |
thread checking | go gauge |
Factory Strength
1. Strong and Advanced Equipment
2. 20 Years of Casting Experience to Provide One-Stop Service
3. Advanced process standard system
4. 9 Steps of Tedious Process German standard casting
5. Senior Team with Multiple Honors
Packaging & Delivery:
Packaging Details: Neutral packing or as per customer's requirements. Inner box, outer carton and pallet
Port: Foshan Shunde,China
Lead time:
Qty | 1-1000 | 1001-10000 | >10000 |
Estimated time(days) | 10 | 20 | To be negotiated
|
Pre-sale service:
1. We have full stock and can deliver within short time.
2. OEM and ODM order are accepted, Any kind of logo printing or design are available.
3. Good Quality + Factory Price + Quick Response + Reliable Service, is what we are trying best to offer you.
4. All of our products are produced by our professional workman and we have our high-work-effect foreign trade team, you can totally believe our service.
After you choose:
1. We will count cheapest shipping cost and make invoice to you at once.
2. Check quality again, then send out to you at 1-2 working day after your payment
3. Email you the tracking number and help to chase the parcels until it arrives you.
After-sale service
FAQ:
1. How can I get the price?
-We usually quote within 24 hours after we get your inquiry (Except weekend and holidays).
-If you are very urgent to get the price, please email us or contact us in other ways so that we can offer you a quote.
2. Can I buy samples placing orders?
-Yes. Please feel free to contact us.
3. What is your lead time?
-It depends on the order quantity and the season you place the order.
-Usually we can ship within 7-15 days for small quantity, and about 30 days for large quantity.