103mm Length Stainless Steel Threaded Tube SS 316 Drawing Needed ISO9001
Stainless steel 316 Threaded Tube 14618 machining part kitchen tap components designed by customer Roughness 1.6
We specialize in product design, mold manufacturing, production, packaging. We can offer the best products and services at competitive prices.
1. OEM manufacturers.
2. Non-standard parts.
3. A small quantity is acceptable.
Parameters:
product name | Threaded tube |
application | kitchen tap |
diameter | D22 |
tolerance | proceed as Standard GB/T 1800.1-2009 IT12 |
raw material | Stainless steel tube |
surface | no burs |
length | 103mm |
thread | M18x1 |
thread checking | go gauge |
chamfering | C0.2/C0.5/C1 |
Factory Strength
1. Strong and Advanced Equipment
2. 20 Years of Casting Experience to Provide One-Stop Service
Professional and experienced engineer to provide most suitable machining suggestions and accurate evaluation.
Making prototype for confirmation
Helping design suitable package if necessary.
Helping sourcing normal commercial components like nuts, spring and bearings
Following and updating production process
Helping assemble separate parts into final product
100% inspection before shipment
Arranging and tracking shipment
3. Advanced process standard system
4. 9 Steps of Tedious Process German standard casting
5. Senior Team with Multiple Honors
Packaging & Delivery:
Packaging Details: Neutral packing or as per customer's requirements. Inner box, outer carton and pallet
Port: Foshan Shunde,China
Lead time:
Qty | 1-1000 | 1001-10000 | >10000 |
Estimated time(days) | 10 | 20 | To be negotiated
|
We could check the freight by express/by air/by sea for your checking if you need, you can choose the one which is the most convenient or cost effective for you. Please inform us the terms of delivery when you confirm the order.
FAQ:
Q1: How Can I get a quotation?
A1: Please provide 2D or 3D files or samples. Draw format: IGS, STEP, STP, JPEG, PDF, DWG, DXF, CAD etc.
Q2: What is your MOQ?
A2: Do not have MOQ limited, trial order before mass production is welcomed.
Q3: What about quality control?
A3: Self-inspection in every process by the production operator. Spot inspection and final inspection executed by QC, Defective rate controlled within 2% even lower.