Specifications
Place of Origin :
China
Brand Name :
CEI-Kinte
Certification :
ISO9001/FEM/ISO14001/OHSAS 18001
Model Number :
Customized
MOQ :
Negotiable
Price :
Negotiable
Packaging Details :
Packed with plastic films and wrap with strips
Delivery Time :
According to customer's requirement
Payment Terms :
Negotiable
Supply Ability :
Strong production capacity
R&D :
Professional R&D Team
Workshop :
Body Shop
Manufacturing :
In-house
Equipment :
Automation
Flexibility :
High
Sub-assembly :
Main line/Bodyside/Closures/Floor line etc.
Welding :
Spot welding/MAG MIG/Stud welding etc.
Layout :
CAD drawing
Description

Chery Kaifeng Plant 30JPH Capacity Improvement Project

1. Project name:

Chery Kaifeng Plant 30JPH Capacity Improvement Project

2. Project time:

December 2019

3. Project location

Chery Kaifeng Plant

4. Project introduction:

Models: 5 models (X70/X90/X90 base model/X95/65EV)

Capacity: 30JPH

Beat: 108S

Robots: NACHI, EFORT and KUKA brands, quantity 99 units

Model switching form: side trihedral turntable, side wheel cover online flexible hemming, engine room cross slide table switching library system, main off-line rolling bed skid conveyor system, general assembly GEO gripper positioning system, robot automatic glue coating system

5. Core technology:

1. On-line flexible hemming of side trihedral turntable and side wheel cover

2. Switching warehouse system of engine room cross slide table, main off-line rolling bed skid conveying system

3. The total GEO gripper positioning system and robot automatic glue application system

As one of the four major processes in the automotive industry, the welding process is self-evident. It shoulders the important mission of forming the body and providing a supporting frame for the vehicle. In addition to ensuring the appearance and shape, it must also ensure that all parts of the final assembly The precision of the component installation point, so its process is far more complicated than the other three major processes. The planning and layout of the production line not only need to consider from the aspects of precision assurance, production efficiency, distribution logistics, and storage, but are also limited by the plant area and structure, Existing conditions such as painting corridors. There is no perfect layout plan, only the most suitable layout plan at present.

6. Logistics and warehousing planning

Logistics warehousing planning should be considered comprehensively in combination with process layout and production tempo, and should roughly follow the following principles:

(1) The size of the storage area should meet the basic inventory requirements. The basic inventory is generally not less than 2 hours of consumption. The area of the storage area should be calculated based on the total number of parts, the size of the parts station and equipment, and the number of frames to ensure that the area is not less than the area required for 2 hours of inventory.

(2) The storage area should be close to the logistics door of the workshop and the logistics channel of the factory area.

(3) In consideration of logistics efficiency and space saving, the width of logistics channels between welding lines is generally about 3m.

(4) Logistics channels must be reserved for all workstations that need to be loaded to ensure distribution space.

(5) The logistics direction cannot be opposite to the overall flow direction of the body.

Chery Kaifeng Plant 30JPH Capacity Improvement ProjectChery Kaifeng Plant 30JPH Capacity Improvement ProjectChery Kaifeng Plant 30JPH Capacity Improvement ProjectChery Kaifeng Plant 30JPH Capacity Improvement Project

Send your message to this supplier
Send Now

Chery Kaifeng Plant 30JPH Capacity Improvement Project

Ask Latest Price
Place of Origin :
China
Brand Name :
CEI-Kinte
Certification :
ISO9001/FEM/ISO14001/OHSAS 18001
Model Number :
Customized
MOQ :
Negotiable
Price :
Negotiable
Contact Supplier
Chery Kaifeng Plant 30JPH Capacity Improvement Project
Chery Kaifeng Plant 30JPH Capacity Improvement Project
Chery Kaifeng Plant 30JPH Capacity Improvement Project
Chery Kaifeng Plant 30JPH Capacity Improvement Project

Guangzhou Kinte Electric Industrial Co., LTD

Verified Supplier
4 Years
guangzhou
Since 1958
Business Type :
Manufacturer, Exporter
Total Annual :
300000000-500000000
Employee Number :
2500~2800
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement