1. Full demonstration and innovation of process plan
2. Sufficient on-site surveying and mapping, logistics confirmation
3. Detailed construction plan
4. Rigorous project plan
5. Personnel and materials management
6. Standard project management; standard documents, SAP
1. Mobilization before construction
2. Daily work arrangement and confirmation
3. Safety management
4. Emergency plan
5. Logistics support, customer support, logistics support, customer support
1. 24-hour production accompany
2. Quick response to problem points
3. Summary and standardization
Digital transformation is introduced for line verification and transformation in virtual lines, to greatly reduce the on-site transformation time and shorten the whole transformation cycle.
The transformation can be applied widely, including main line, side enclosure line, floor assembly line, floor main line, four-door and two-cover lines etc.
Modular upgrading can be implemented to lines based on KINTE standard solutions.
Line transformation is integrated with the MISP system independently developed by KINTE, to intelligently monitor and diagnose lines and predict the failure points of lines, and therefore to greatly reduce the failure rate of lines.
Make the best use of existing production lines
Make the best use of existing production lines
Make sure of no quality fluctuation due to the introduction of new technologies
Shorten transformation cycle and reduce impacts of production suspension
Realize flexible compatibility without mechanical transformation at the introduction of new models