CE Certification Shrink Sleeve Labeling Machine , PET PVC Sleeve Label Applicator
CE certification shrink sleeve labeling machine ,heat shrink tunnel , PET PVC shrink sleeve labeling machine
Feature:
1. Updated machine. Humanized design. Simple maintenance.
2. The machine mainframe is stainless steel, simple and safe maintenance, waterproof and rustproof.
3. Cutting label does not adjust the sensor position, any label length can correct by HMI.
4. New type cutting design, cutting is flat without chip, beautiful shrink results.
5. Modular design, guarantee to change all the size within ten minutes, and no using of auxiliary tools.
6. Spare part adopts famous brand,the machine working life is long.
Technical Parameter
Input Power: | 2.0kw |
Input Voltage: | 3Φ380V/220VAC |
Speed: | 100BPM |
Size of Host Machine: | 2000(L)x900(W)x2000(H) |
Applicable Diameter of Bottle Body: | Φ28mm-Φ125mm |
Applicable Length of Label: | 30mm-250mm |
Applicable Thickness of Label: | 0.03mm-0.13mm |
Applicable Internal Diameter of Paper Tube: | 5︒-10︒(Free adjustment) |
HSL-1500Z Steam Shrink Tunnel
Technical Parameter
Input Power Supply of Blower: | 3Φ380V/0.55KW |
Transporting Speed: | 0-30m/min |
Working Pressure: | <=0.2Mpa |
Weight: | 250/kg |
External Dimension: | 1500(L)x600(w)x1700(H) |
Steam Consumption: | 24kg/h |
HTB-24 Steam Generator
Technical Parameter
The water is fed into the series of wholly automatic electrical heating generator by high pressure potential vortex pump made of copper with short water-supply time and durable service. A floating ball for liquid level is fixed in the water tank to automatically control the water inlet. Working system is all automatically controlled. After connection the water supply and power supply for 5 minutes or so, it can output the steam continuously with a high level of working efficiency.
Input Power Supply: | 3Φ380V |
Input : | 24KW |
Steam Pressure: | 0.25-0.4Mpa |
Vaoor Generation: | 48kg/h |
Weight: | 100KG |
External Dimension: | 600(L)x550(W)x1200(H) |
Our machine pictures
Our service:
After sales service:
1.Installation & adjustment
After the equipment are arrived at the customer’s site, the customer is responsible for unpacking and arranging the equipment according to the placement drawing; and does under our install-adjust technicians’ guidance. Costs of the staff are decided at last.
2.Training
We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance.
The buyer can send staff to our company for learning.
3.Quality assurance
We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.
4.Warranty
Offer 12 months maintenance period to the problem that caused by our design, manufacture and the material quality, and offer the relevant parts and effective service for free for above reason. We will offer a widely and favorable technical support, after service all the time after guarantee period.