Water Filling Bottling Line Plastic Bottling Machine
15000 Bph Filling Production Line
Product Application:
This machine has washer,filler,capper three functions in one body, it is automatic in total process and suitablefor PET bottled juice and tea drink which can resistant high temperature.It also can be used for mineral water,pure water and many other no gas containing drinks. It makes by high quality SUS304, key parts are precision machined by NC tool.The total machine uses advanced photoelectric detection technology to detect each parts operation status, no bottle no filling, and no bottle no capping, automatic and easy operation.
1. Bottle Blowing Machine
2 water treatment system
3 water Filling machine
MACHINE SPECIFICATION
Model | CGF8-8-3 | CGF14-12-5 | CGF18-18-6 | CGF24-24-8 | CGF32-32-10 | CGF40-40-12 | CGF50-50-15 |
Capacity(B/h) | 2000 | 5000 | 8000 | 12000 | 15000 | 18000 | 24000 |
Floor Area | 300m2 | 400m2 | 600m2 | 1000m2 | 2000m2 | 2500m2 | 3500m2 |
Total Power | 100KVA | 100KVA | 200KVA | 300KVA | 450KVA | 500KVA | 600KVA |
Workers | 8 | 8 | 6 | 6 | 6 | 6 | 6 |
4. bottle dry machine
5. laser date printer
6. PVC sleeve labeling Machine
7. PE film Wrapping Machine
SERVICE | |
1 | Warranty period is 12 months from the date of shipment. |
2 | After we receipt 30% advance deposit, we will start to produce. When the machine is completed, buyers come to observe and test machine by themselves, until the machine is running OK, we will arrange the shipment after the buyer pay for the other 70% balance. |
3 | The seller should supply the parts which is damaged non-contrived and is included in the standard configuration of this machine without any charges. The seller pay for freight in China, and the buyer should pay the freight out of China. |
4 | The seller will send technician to seller to maintain the machine within one week after receiving the visa to your company during the warranty period of this machine. |
5 | The seller should supply spare parts and service of maintenance to buyer out of warranty period, but the buyer should pay for the cost of parts and freight out of China and pay the round trip tickets between China and buyer, lodging and dinner, medical treatment, etc. |
6 | The buyer should get all conditions (raw material, water, power, compress air and tools) for installation and commissioning well before seller’s technician arrives at buyer’s factory. |
7 | The seller should supply buyer the documents for installation and commissioning within 5 days after contract is available, other related documents will be supplied to buyer before shipment. |
8 | The seller should send two or three technicians to buyer’s company make installation and commissioning of this machine. The time of installation and commissioning is 20 days from the date which seller’s technicians arrive at buyer’s factory and the seller prepare well all conditions for installation and commissioning. The buyer should pay for the charges of visa cost, round trip ticket, lodging, meal and Inland traffic to seller’s technician. And give each technician salary 100 USD one day. |
9 | The seller supply training service for buyer without any charges before shipment, and can train buyer’s technicians continuously when seller’s technicians install and adjust the machine. |