CGF18-18-6 water beverage bottle filling machine 6000BPH
Product Application : This washing filling capping machine is mainly used for Non-aerated carbon dioxide drink, such as mineral water, pure water and so on.The machine design is shorten the time for the drink material contact with outside, Increase the sanitation condition throughout economy benefit.
Capability Character : It adopts hanging type conveying-bottle structure to make changing bottle model more convenient, faster and easier. The main machine adopts advanced PLC control technology. The key electric elements adopt international famous products.
Complete Line as below :
Water Filling Machine 3 in 1
l Usage: washing, filling and capping 3 in 1 monoblock is used for filling liquid into PET bottle. Full automatically; it can finish washing (bottle), filling and capping three jobs in the one machine.
l Primary features
1) Compact conformation, good shape, cozy operation, excellent automatic and poor labor intensity.
2) Only exchanging “star wheel”, ”feeding screw” and “arc guide plate” while exchanging model of bottle to be need.
3) The all parts directly contacted with media are all adopted with food stage stainless steel without dead angle, so they can be cleaned easily.
4) Adopting advanced valve to control the inlet flow rate of liquids. It can keep the slight turbulence of liquids level in the solution barrel and ensure the accuracy infilling.
5) Closing feeding valve automatically while no bottle on machine avoiding the loss of aqueous feet. Filling automatically with a high speed and the control of liquids level is accurate.
6) High filling speed and mass flow rate, high precision of filling valve and control of liquids level is accurate and without loss.
7) The “capping head” is adopted magnetic-constant-torque device to ensure the high capping quality and without damages.
8) Adopting efficient cap settling system which carried perfect cap feeding and protection device.
9) It is adopted spiral descent fashion for the support plate for bottom of bottle at the outlet thumb wheel. And to adjust the input height is not necessary for exchanging modelof bottle.
10) Carried the perfect protection system to overload; it can be used to protect facilitiesand operators efficiently.
11) Because of applying touch screen for operation, it is possible to realize man-machine conversation whereas the status of device running is clear at aglance.
12) The primary electric components such as touch screenPLCtransducer etc. are all adopted with world famous products.
SERVICE | |
1 | Warranty period is 24 months from the date of shipment. |
2 | After we receipt 30% advance deposit, we will start to produce. When the machine is completed, buyers come to observe and test machine by themselves, until the machine is running OK, we will arrange the shipment after the buyer pay for the other 70% balance. |
3 | The seller should supply the parts which is damaged non-contrived and is included in the standard configuration of this machine without any charges. The seller pay for freight in China, and the buyer should pay the freight out of China. |
4 | The seller will send technician to seller to maintain the machine within one week after receiving the visa to your company during the warranty period of this machine. |
5 | The seller should supply spare parts and service of maintenance to buyer out of warranty period, but the buyer should pay for the cost of parts and freight out of China and pay the round trip tickets between China and buyer, lodging and dinner, medical treatment, etc. |
6 | The buyer should get all conditions (raw material, water, power, compress air and tools) for installation and commissioning well before seller’s technician arrives at buyer’s factory. |
7 | The seller should supply buyer the documents for installation and commissioning within 5 days after contract is available, other related documents will be supplied to buyer before shipment. |
8 | The seller should send two or three technicians to buyer’s company make installation and commissioning of this machine. The time of installation and commissioning is 20 days from the date which seller’s technicians arrive at buyer’s factory and the seller prepare well all conditions for installation and commissioning. The buyer should pay for the charges of visa cost, round trip ticket, lodging, meal and Inland traffic to seller’s technician. And give each technician salary 100 USD one day. |
9 | The seller supply training service for buyer without any charges before shipment, and can train buyer’s technicians continuously when seller’s technicians install and adjust the machine. |