Doypack Premade Bags Pouch Cocoa Powder Sachet Packing Machine
We have many years of service experience in food, pharmaceutical, chemical, edible oil and other industries. We built a long-term business relationship with China's largest dairy company Yili, Wandashan, Junlebao and other food companies. Our main service team has many years of working experience in packaking area.The company's position in the market is providingigh quality and high grade equipment for our customer.Our company is one of the top five packaging companies in China. Our factory covers an area of 5000 square meters and has more than 80 employees. We have been engaged in researching and producing packing machines for many years
Specification:
Model | RT-180G | RT-210G | RT-240G | RT-330GD |
Pouch Types | Flat bag, or with optional Hanging hole, Zipper, Spout | |||
Pouch Size (mm) | 70 (Min.) | 75(Min.) | 80 (Min.) | 85(Min.) |
180-225(Max.) | 210-320(Max.) | 240-350(Max.) | 320-450 (Max.) | |
Volume (Max.) | 400ml | 1000ml | 1500ml | 2000ml |
Speed (bpm) | 30-60 | 30-50 | 30-50 | 30-80 |
Power (kw) | 3.5 | 4.5 | 5.5 | 6.5 |
Weight (kg) | 1000 | 2000 | 2300 | 3000 |
Work Principle:
suitabl
Features:
for pouch type specifications, packaging capacity is big, the product small batch of users, can satisfy the commonly used three autoregulating, four outside edge-sealing pouch, hang hole is able to be more self-reliance pouches, self-supporting zipper pouches, special pouches and other special type pouch packaging; Suitable for powder, granule, liquid, paste, solid content of various materials such as packaging needs; Switch type pouch is simple and fast
Bag Types:
Real Picture in the workshop
Our products includes vertical packing machine,horizontal packing machineandpackage production line and automatic liquid filling production line etc.
Packing EXPO
International stardard wooden box packinage machine
The initial installation is NOT included with the professional ROTY team member. All installation with the ROTY team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While ROTY team member arrives at the site for a complete and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days may vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours..
ROTY provide free parts and parts delivery, when manufacture defects has been detected during normal operation (vulnerable parts not included) under warranty period.