Horizontal Form Rolling Pouch Enzyme Jelly Beverage Drinks Laundry Detergent Sachet Filling Packing Sealing Machine
Specification:
Model | RT-180SD | RT-210SD | RT-240SD | RT-330SD |
Pouch Types | Flat bag, or with optional Hanging hole, Spout | |||
Pouch Size (mm) | 70 (Min.) | 75(Min.) | 80(Min.) | 80-120(Min.) |
180-225(Max.) | 210-320(Max.) | 240-350(Max.) | 320-450 (Max.) | |
Volume (Max.) | 400ml | 1000ml | 1500ml | 2000ml |
Speed (bpm) | 60 to 90 | 60 to 1000 | 70 to 100 | 60 to 120 |
Power (kw) | 3.5 | 4.5 | 5.5 | 6.5 |
Weight (kg) | 1000 | 2000 | 2300 | 3000 |
Work Principle:
Main Components | Vendor |
PLC | SIMENS |
Touch Screen | SIMENS |
Inverter | SIMENS |
Servo Motor | SIMENS |
Photocell | Autonics Korea |
Main Motor | ABB Switzerland |
Pneumatic Parts | AIRTAG |
Vacuum Generator | AITTAG |
Bag Types:
Real Picture in the workshop
Our products includes vertical packing machine,horizontal packing machineandpackage production line and automatic liquid filling production line etc.
Packing EXPO
International stardard wooden box packinage machine
The initial installation is NOT included with the professional ROTY team member. All installation with the ROTY team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While ROTY team member arrives at the site for a complete and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days may vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours..