Horizontal Form Rolling Stand-Up Pouch Doypack Granule Prawn Crackers Shrimp Chips Snack Sachet Packing Machine
Related products:
1. Doypack Granule Packing Machine
2. 3 or 4 sides Sealing Ketchup Liquid Packing Machine
3. Spout Bag Ketchup Liquid Packing Machine
4. Sachet nuts Packing Machine
Shanghai Rutian Packaging Co., Ltd. has many years of service experience in food, pharmaceutical, chemical, edible oil and other industries. And China's largest dairy company Yili, Nestle, Wandashan, Junlebao and other food companies. Our main service team has many years of working experience.The company's position in the Chinese market is to provide high quality and high grade equipment for our customer.Our company is one of the top five packaging companies in China. Our factory covers an area of 5000 square meters and has more than 80 employees. We have been engaged in researching and producing packing machines for many years
Features:
Choices for mutilple sealing types of international standard. Safety protection by mutilple layers to keep products from penetration.
Visible during the packing ,easy to learn the operation, convenient and quick to adjust package size.
Packaging type for pouch is selective for 3 side 4 side sealing.
Specification:
Model | RT-180S | RT-210S | RT-240S | RT-330S |
Pouch Types | Flat bag, or with optional Hanging hole, Zipper, Spout | |||
Pouch Size (mm) | 70 (Min.) | 75(Min.) | 80 (Min.) | 85(Min.) |
180-225(Max.) | 210-320(Max.) | 240-350(Max.) | 320-450 (Max.) | |
Volume (Max.) | 400ml | 1000ml | 1500ml | 2000ml |
Speed (bpm) | 30-60 | 30-60 | 30 to 60 | 20-50 |
Power (kw) | 3.5 | 4.5 | 5.5 | 6.5 |
Weight (kg) | 1000 | 2000 | 2300 | 3000 |
Work Principle:
Bag Types:
Real Picture in the workshop
Our products includes vertical packing machine,horizontal packing machineandpackage production line and automatic liquid filling production line etc.
Packing EXPO
The initial installation is NOT included with the professional ROTY team member. All installation with the ROTY team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While ROTY team member arrives at the site for a complete and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days may vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours..
ROTY provide free parts and parts delivery, when manufacture defects has been detected during normal operation (vulnerable parts not included) under warranty period.
International stardard wooden box packinage machine