PSN 110V DC24v Switching Power Supply Lightweight For Printing Machine
Magnetic Particle Clutch Use Constant Current Power Supply For Printing Machine
Size and installing
Brief Introduction
1. Over current, over heating, short- circuit protection.
2. AC 110V/220V voltage input and 24V/36V/48V voltage output technology.
3. Strong constant output current 1A-4A, complete range of specification supplied.
4. 2 control ways: Potentiometer and PLC
Model | Output Voltage | Maximum | Maximum |
Output Power | Output Current | ||
PSN110V-24V | 0-24V | 100W | 4A |
PSN110V-36V | 0-36V | 100W | 3A |
PSN110V-48V | 0-48V | 100W | 2A |
Remark: The output current of constant current power supply is in inverse proportion to the resistance of magnetic powder brake/clutch. The larger the resistance, the smaller Max. Output current of constant current power supply,vice-versa.
Two Control Mode:
Circumscribed PLC control:
a. When PLC output is 0- 5V, jumper cap is in “5V”
b. When PLC output is 0-10V, jumper cap is in “10V”
c. When PLC output is 0-20mA, jumper cap is in “20mA”
Circumscribed potentiometer C ontrol: jumper cap is in “20mA”
Packing and delivery:
1. Neutral carton packing
2. One piece in one carton box
3. Normally pieces in one big carton,this is easy for shipping.
4. One unit shipping
5. Lead time:within 3 days
FAQ
1. When can I get the quotation?
We usually quoted within 12 hours after receiving your inquiry. If you are very urgent to get the price, please call us or tell us in your email, so that we can regard your inquiry priority.
2. How should I place the order?
Please let us know the model number based on our specs for tension controller,web guiding system. For powder clutch, powder brake, please show us your drawing, or let us know your request torque, and then we will provide you suitable model for confirmation.
3. What’s your MOQ basis?
Normally, we don’t have MOQ request.
4. What about the lead time for production?
Honestly, it depends on the order quantity and the type of our products. For tension controller, load cell and edge position controller which is about 1-3 days. For powder clutch, powder brake which need about 3-5days.
5. What is the term of delivery?
We can arrange with EXW, FOB, CIF…etc. You can choose the most convenient one or cost-effective way.