Hotel Drying Tumblers gasLaundry dryer hospital industrial washing machine
1, Product specification :
Model | Capacity | Drum diameter | Electrical heating power (kw) | Washing speed | Low extract | High extract | G-force | Electric heating power | Size | Weight |
(Kg) | (mm) | (kw) | (rpm) | (rpm) | (rpm) | (kw) | (mm) | (KG) | ||
XGQ-30 | 30 | 902 | 20 | 36 | 375 | 760 | 300 | 20 | 1470*1520*1900 | 1500 |
XGQ-50 | 50 | 1080 | 20 | 36 | 345 | 700 | 300 | 20 | 1625*1720*2030 | 2200 |
XGQ-70 | 70 | 1200 | 40 | 34 | 325 | 660 | 300 | 40 | 1820*1880*2300 | 2500 |
XGQ-100 | 100 | 1240 | 40 | 32 | 325 | 660 | 300 | 40 | 1825*2100*2300 | 2900 |
2, The maintainance :
1) regularly check the tightness of the washout triangle belt. Once the tightness is found, it is necessary to adjust immediately or replace the new triangle belt.
2) when washing the clothes with hot water in the washing machine, the water temperature should not exceed 45 degrees.
3) when using the washing machine, it is necessary to strictly operate the instructions on time and prevent failures.
4) disposable clothes should not be overloaded, and should not exceed 80% of the capacity of the washing machine and 50%.
5) the washing machine must be placed in a well ventilated, dry, direct sunlight without combustible and explosive materials.
6) after washing machine, remember to wipe the inside and outside of the equipment with soft dishcloth to prevent failure.
7) once a month or about 30 times per wash, pour the lubricant (lithium grease No. 3) into the oil cup after washing.
8) regularly check the connection of the eloquent gas box, and whether there is any loosening phenomenon. Once it happens, it can be adjusted in time.
9) regularly check whether the discharge port of the bottom of the washing machine bearing seat is open, so as to ensure that there is no water accumulation in the bearing seat, thereby prolonging the service life of the washing machine.
FAQ
♦ How long have you engaged in this industry ?
We are professional washing machine factory found in 1992,there are more than 20 years of experience in OEM and ODM factory in Shanghai .exported machine to Southeast Asia, Middle East, Russia, Europe and the United States
♦ What do you offer technical support after sell ?
We have electronic version manual book of the product , diagnostic book for common machine problems, and we also have video to guid how to installa machine
♦ How do you ensure quality control ?
We have stick quality system in accordance with ISO9001 Standard.stick inspection in each product processing : material inspection(IQC), product inspection(IPQC) and final inspection (FQC) ,which ensure each machine is in good quality before sending out.
We will sincerely hope to establish business cooperation with you, every customers sincerely welcome clients from home and abroad to negotiate business, and create a better tomorrow !