CPP Film Holder Bag Making Machine
Full automatic square bottom paper bag machine, with web, drum head card and paper rope as raw materials, one time complete with handle square bottom paper bag, is the ideal equipment for the rapid production of portable paper bags.Such as shopping bags, shoes and clothing packaging bags, gift packaging bags, business bags and other varieties of hand-held paper bags.
FEATURES AT A GLANCE
*The forming template adopts symmetrical adjustable double-template structure (proprietary technology), so that users of different
sizes of paper bags no longer need to change the template, which can effectively reduce the time of paper bag size adjustment and
increase the machine capacity. *The special type design greatly improves the bag-making range of the machine, which can meet the customer's demand of producing
extra-large hand-held paper bags.
*The electronic control system imported from Japan is adopted to ensure stable and high-speed operation. *Material loading adopts
hydraulic automatic lifting structure.The unwinding device adopts automatic tension control.
*EPC material unwinding adopts ARISE correction to reduce material alignment time.
Main technical Parameters
Material | LDPE,HDPE,etc. |
Unwinding Width | within 1580mm |
Unwinding Diameter | within 800mm |
Machine Speed | 80pcs/min |
Bag Width | within 600mm |
Bag Length | within 550mm |
Bag Speed | 300-400m 60-65pcs/min |
Power Supply | 380V50Hz |
Total Power | 20KW |
Machine Weight | 4500KG |
Pictures as reference
Detailed Images
About Us
Jiangyin ShiXuan Machinery is an integrated company which has gathered development, researching, manufacturing and marketing together. The company abides by the purpose of ′Innovation drives development, quality wins the market′.
Our company can supply customized service for global customers. According to customers′ demand, we can design products and supply long term integrative service of producing, installing and debugging. For service, our company can supply long term technical.
FAQ
1. How long will your engineer reach to our factory?
Within one week after machine arrival at your factory.
2. How many days will you finish installing?
We will finish installation and training within 5days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also car fare.
4. How long of your machine's warranty period?
All our machines have one year guarantee after finishing installation.
5. How could we do after one year warranty period?
We also can offer you our best after service, of course you will afford our technician's cost.