Specifications
Place of Origin :
China
Brand Name :
Great Wall
Certification :
ISO,CE,SGS
Price :
Negotiated
Packaging Details :
Containers(20GP,40HC) Or In Bulks
Delivery Time :
Depending on the order
Payment Terms :
TT Or LC
Supply Ability :
10,000TON average each year
MOQ :
1 Set
Description

When a gap to be bridged is too wide to be economically crossed by a single span structure, it is necessary to provide intermediate piers and install a multi-span bridge.
The positioning of intermediate piers is often dictated by the local geology and topography of the site. Otherwise, the positioning and quantity of piers depends upon the most economic balance between the cost of the piers and the cost of the bridge construction appropriate to the varying span lengths.
It is a design feature of CB200 Bridging that in addition to simple spans, it may also be erected to form multi-span structures. This can be done in two ways; either with continuous bridge trusses supported or as a series of broken-spans linked at each intermediate pier by span junction equipment. It should be noted that both of these options provide a continuous road deck for the traffic.
Mutispan Bailey Bridge
Muti-span bailey bridge,4 spans,three piers ,long span bailey bridge,CB100 bailey
Send your message to this supplier
Send Now

Muti-span bailey bridge,4 spans,three piers ,long span bailey bridge,CB100 bailey

Ask Latest Price
Place of Origin :
China
Brand Name :
Great Wall
Certification :
ISO,CE,SGS
Price :
Negotiated
Packaging Details :
Containers(20GP,40HC) Or In Bulks
Delivery Time :
Depending on the order
Contact Supplier
Muti-span bailey bridge,4 spans,three piers ,long span bailey bridge,CB100 bailey

Zhenjiang Great Wall Group Co.,Ltd

Active Member
9 Years
jiangsu, zhenjiang
Since 2006
Business Type :
Manufacturer, Exporter, Trading Company, Seller, Other
Total Annual :
30% - 40%
Employee Number :
200~500
Certification Level :
Active Member
Contact Supplier
Submit Requirement