Specifications
Brand Name :
Great Wall
Certification :
ISO,CE,SGS
Place of Origin :
China
MOQ :
1 set
Price :
Negotiated
Payment Terms :
L/C, T/T
Supply Ability :
1000TON each year
Delivery Time :
Depending on the quantity
Packaging Details :
In Bulks
Description

Pontoon Bailey bridge is similiar to standard bailey bridge actually;Its special feature is that the supports are made from pontoons.It has the advantages of fast-installed,easy-dismantled,parts-interchangeable,etc.
It is widely used in the military transportation,emergency earthquake and flooding relief work and road,bridge,railways construction,etc.

Pontoon  Bailey bridge/steel bridge design/bailey bridge

Name Bailey pontoon bridge
Alias assembled pontoon bridge; assembled highway steel bridge, steel bridge, steel trestle bridge; temporary pavement; temporary bridge; Bailey bridge;
Model 321; 200; GW D;
Commonly used truss plate models 321 type Bailey film, 200 type Bailey film, GW D type Bailey film, etc.
Maximum single span of steel bridge design about 60 meters
Standard lane width of steel bridge single lane 4 meters; double lane 7.35 meters; design according to demand.
Load Class Automobile Class 10; Vehicle Class 15; Vehicle Class 20; Track Class 50; Trailer Class 80; Bicycle 40 tons; AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian Standard Class-40; Australian Standard T44; Korean Standard D24, etc. Tail
Design scheme According to the different spans and loads, choose the appropriate arrangement and floating box scheme.
Main Material of Steel Bridge GB Q345B
Connection pin material 30CrMnTi
Connection bolt grade 8.8 grade high strength bolt; 10.9 grade high strength bolt.
Surface anti-corrosion hot-dip galvanizing; paint; heavy-duty anti-corrosion paint for steel structure; asphalt paint; anti-skid aggregate treatment for bridge deck, etc.
Bridge erection methods hoisting method; floating method, etc.
Installation time 30-60 sunny days after abutment and other conditions are met (determined by bridge length and site conditions)
Installation requirements 15-20 workers (determined according to site conditions)
Installation equipment crane, hoist, jack, hand hoist, welding machine, generator, etc. (adjustable according to site conditions)
Features of steel bridge No need to be pier, interchangeable, removable, long service life

Send your message to this supplier
Send Now

Pontoon Bailey bridge/steel bridge design/bailey bridge

Ask Latest Price
Brand Name :
Great Wall
Certification :
ISO,CE,SGS
Place of Origin :
China
MOQ :
1 set
Price :
Negotiated
Payment Terms :
L/C, T/T
Contact Supplier
Pontoon  Bailey bridge/steel bridge design/bailey bridge
Pontoon  Bailey bridge/steel bridge design/bailey bridge
Pontoon  Bailey bridge/steel bridge design/bailey bridge
Pontoon  Bailey bridge/steel bridge design/bailey bridge
Pontoon  Bailey bridge/steel bridge design/bailey bridge
Pontoon  Bailey bridge/steel bridge design/bailey bridge
Pontoon  Bailey bridge/steel bridge design/bailey bridge

Zhenjiang Great Wall Group Co.,Ltd

Active Member
9 Years
jiangsu, zhenjiang
Since 2006
Business Type :
Manufacturer, Exporter, Trading Company, Seller, Other
Total Annual :
30% - 40%
Employee Number :
200~500
Certification Level :
Active Member
Contact Supplier
Submit Requirement