Bearing Steel Mining Equipment Parts Mine Machine Annular Gear
Introduction:
The ring gear is inlaid on the outer edge of the flywheel after being heated, and fastened to the outer edge of the flywheel after cooling, used to mesh with the starter gear, drive the crankshaft to rotate, and start the engine
Name | Bearing Steel Mining Equipment Parts Mine Machine Annular Gear |
Model | Mine Machine Annular Gear |
Material | Bearing Steel |
Our products include :
containΦ2.2 to 4.8m series slip type, bearing type and double slide shoe high-fine cement mills and rotary kilns, 1.7m and above vertical mills, pre-grinding crushing mills, bag filters, cyclones, garbage carbide and digesting furnaces, combined garbage burning and hot water boilers, together with iron ore ball mills, crushers, magnetic separators, classifiers, powder concentrators, filters, conveyors and hoists of all sizes, including 17 certified national patent products, and are sold both in and out of China. Of all these products, the crusher and the ball mill have been honored ministry-level high-quality products, national famous metallurgical brand products, provincial famous brand products, inspection-exempted products granted by Hebei Bureau of Quality & Technology Supervision and provincial consumer-trusted products. The company has also been listed among the provincial quality performance enterprises, provincial star enterprises, provincial consumer trusted organizations, provincial advanced image constructors, provincial credible and law-observing enterprises and national excellent township business groups.
FAQ to save your precious time!
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.