1. The use of rare earth composite magnetic system, advanced technology, reasonable structure.Through the special design, the magnetic field intensity distribution of the selected area and swept selection area is more reasonable, and the sorting effect is more obvious.
2. Tank through special design, not easy to block, running material.
3. The two ends adopt wear - resistant aluminum flange, drum surface lining with wear - resistant material, wear - resistant
performance long service life.
4. Cycloidal reducer, small volume, light weight, less power consumption.
5. Simple structure, large handling capacity, simple operation, easy to maintain.
Name | Heat Resistant Drum Type Magnetic Separator For Crushing Production Line |
Model | Magnetic Separator |
Application | Crushing Production Line |
Technical Specifications and Performance
Model | Cylinder size mm | Magnetic field strength mT | Motor Power kw | Reducer model | Processing capacity |
CTB609 | Φ600x900 | ≥120 | 1.5 | JZQ250 | 8-15 |
CTB612 | Φ600x1200 | ≥120 | 1.5 | JZQ250 | 15-25 |
CTB618 | Φ600x1800 | ≥120 | 2.2 | JZQ250 | 15-30 |
CTB718 | Φ750x1800 | ≥120 | 3 | JZQ250 | 20-45 |
CTB918 | Φ900x1800 | ≥135 | 4 | JZQ350 | 30-50 |
CTB 1018 | Φ1050x1800 | ≥135 | 5.5 | JZQ400 | 40-75 |
CTB 1021 | Φ1050x2100 | ≥135 | 5.5 | JZQ400 | 45-80 |
CTB 1024 | Φ1050x2400 | ≥135 | 5.5 | JZQ500 | 52-100 |
CTB 1030 | Φ1050x3000 | ≥135 | 7.5 | JZQ500 | 52-100 |
CTB 1230 | Φ1200x3000 | ≥135 | 7.5 | JZQ500 | 80-150 |
CTB 1224 | Φ1200x2400 | ≥135 | 7.5-11 | JZQ500 | 50-110 |
CTB 1236 | Φ1200x3600 | ≥135 | 7.5-15 | JZQ500 | 90-140 |
CTB 1530 | Φ1500x3000 | ≥135 | 11-18.5 | JZQ500 | 140-260 |
CTB 1536 | Φ1500x3600 | ≥135 | 15-22 | JZQ650 | 150-280 |
CTB 1540 | Φ1500x4000 | ≥135 | 15-22 | JZQ650 | 190-350 |
CTB 1545 | Φ1500x4500 | ≥135 | 18.5-30 | JZQ560-750 | 210-390 |
Comapny introduction
Tangshan Mine Machinery Factory is a specialized manufacturer that produces complete sets of equipment for metallurgy, mining, building materials, environmental protection, as well as the design and manufacture of complete sets of sand and gravel materials, and the design and manufacture of dry tailings discharge. The company was founded in 1971 and turned into a joint-stock enterprise in 1997.
The company occupies more than 50 acres, with total assets of 90 million yuan and more than 200 employees, including 96 engineering and technical personnel.
Various processing and testing equipment: 8 meters, 5 meters, 4 meters vertical lathes, 8 meters, 5 meters, 3.15 meters gear hobbing machine, 6 meters planer, precision boring machine, medium frequency quenching and other larger processing equipment and automatic welding, ultrasonic welding More than 300 sets of flaw detectors, W15-23 material testing machines, aging vibration devices, etc.
The main products are: various models and specifications of Jinma brand crushers, ball mills, classifiers, magnetic separators, dewatering screens, linear screens, screening machines, feeders, vertical roller mills, etc.
Among them, 17 products have obtained national patents. Among them, the crusher and ball mill have won many national honors.
The products are sold all over the country and exported to Russia, Mongolia, South Korea, Chile and other international markets.
We are a member of the China Heavy Machinery Association, a member of the Crushing and Grinding Association, a member of the Mining Machinery Association, and a member of the China Building Materials Machinery Association. We have participated in the formulation of a number of equipment manufacturing standards.
FAQ to save your precious time!
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?