Permanent Magnetic Rotary Drum Vacuum Filter Outside Filtering Surface
PRINCIPLE
Filter mainly rely on the effect of open magnetic system which rowed by permanent magnet internal the cylinder, to form filter cake.When the magnetic materials putted into the feedbox, the solid particles of magnetic material absorbed to the cylinder filter rapidly as magnetic cluster, under the magnetic effects and their own gravity (At the moment, it can make use of amount of compressed air to blast to help the mineral particles on the filter cake layering by granularity). Due to the upper material, the effect of layering the mineral among the filter cake by granularity is more obviously, thick structure with great permeability along with the drive cylinder enter the dewatering zone. On the effect of vacuum,the residual water among the filter cake through the filter, then pass the screening room and the two heads of vacuum tube distribution road be singled out. Materials that have been dehydrated blowed down by the compressed air in unloading zone.Filter access to clean area after discharge. Cleaning is the turn of the blast and water.Forced by the compressed air, the water was blowed out of the cylinder so that established a better cleaning process. Prevented the plug of filter pore, and prepare good conditions for next dehydration of the materials.
Name | Permanent Magnetic Rotary Drum Vacuum Filter Outside Filtering Surface |
Model | Drum Vacuum Filter |
Feature | Permanent Magnetic |
Technical Specifications and Performance
Model | GYW-3 | GYW-5 | GYW-8 | GYW-12 | GYW-20 |
Filter area m2 | 3 | 5 | 8 | 12 | 20 |
Cylinder size Diameter length | 1600 700 |
2000 900 | 2000 1400 | 2000 2000 | 2250 2650 |
Rotating speed of cylinder r/min | 0.5-2 | 0.5-2 | 0.5-2 | 0.5-2 | 0.5-2 |
Magnetic induction intensity of cylinder surface mT | 82 |
82 |
82 |
87 | 87 |
Concentrate moisture % | 8-11 | 8-11 | 8-10 | 8-10 | 8-10 |
Production capacity t/h feeding size 0.15-0.8 | 6-9 | 9-13 | 15-25 | 22-33 | 54-108 |
Motor Power kw | 1.5 | 1.5 | 1.5 | 2.2 | 4 |
Vacuum kPa | 60-80 | 60-80 | 60-80 | 60-80 | 60-80 |
Pumping rate m3/min.m2 | 0.5-2 | 0.5-2 | 0.5-2 | 0.5-2 | 0.5-2 |
Blast pressure (Continuous blowing) Mpa | 0.01-0.03 | 0.01-0.03 | 0.01-0.03 | 0.01-0.03 | 0.01-0.03 |
Blast pressure (Continuous blowing) m3/min.m2 | 0.1-0.5 | 0.1-0.5 | 0.1-0.5 | 0.1-0.5 | 0.1-0.5 |
Filter dewatering zone angle (degrees) | 176 | 176 | 176 | 176 | 176 |
Angle of unloading area (degrees) | 21 | 21 | 21 | 21 | 21 |
Regeneration area angle (degrees) | 100 | 100 | 100 | 100 | 100 |
Gross weight kg | 3265 | 3935 | 4754 | 5494 |
Company introduction
Tangshan Mine Machinery Factory is a specialized manufacturer that produces complete sets of equipment for metallurgy, mining, building materials, environmental protection, as well as the design and manufacture of complete sets of sand and gravel materials, and the design and manufacture of dry tailings discharge. The company was founded in 1971 and turned into a joint-stock enterprise in 1997.
The company occupies more than 50 acres, with total assets of 90 million yuan and more than 200 employees, including 96 engineering and technical personnel.
Various processing and testing equipment: 8 meters, 5 meters, 4 meters vertical lathes, 8 meters, 5 meters, 3.15 meters gear hobbing machine, 6 meters planer, precision boring machine, medium frequency quenching and other larger processing equipment and automatic welding, ultrasonic welding More than 300 sets of flaw detectors, W15-23 material testing machines, aging vibration devices, etc.
FAQ to save your precious time!
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.