Mining Cement Ball Mill for Mineral Processing Plant
STRUCTURE
This kind of ball mill consists of several parts including fillings entrance setup,main bearing,rotary part.transmission part, gear cover and so on. The tube which equipped with anti-friction sheathing board inside is welded of rolled steel plate. There is a hole on the tube for the use of the maintenance worker can get in and out to maintain or repair the machine.
PRINCIPLE
Ball mill grinding machine is a kind of horizontal drum-type grinding mill with external gear and double bins. Materials goes evenly through quill shaft in feeding device into the first bin, which has ladder lining or ripple lining with steel balls in different specifications.Steel balls are taken to a certain height by centrifugal force from drum rotation and then fall. Thus it will give a heavy blow to materials, playing a role of grinding. Materials after crushed in the first bin shall enter bin across single-layer diaphragm into the second, which is provided with flat lining with steel balls, to go through further grinding. The ground materials are discharged through the discharging board thus the grinding process is finished.
Name | Mining Cement Ball Mill for Mineral Processing Plant |
Processing Capacity(t/h) | 8-10 |
Weight | |
Technical Specifications and Performance
Model(wet) | Rotating speed of cylinder | Input size(mm) | Motor Power(Kw) | Processing Capacity(t/h) | |
Tile | Bearing | ||||
MQ1500*3000 | 33.3 | <=20 | 95 | 80 | 8-10 |
MQ1500*6200 | 33.3 | <=20 | 155 | 8-10 | |
MQ1600*4500 | 29.8 | <=20 | 130 | 130 | 7-14 |
MQ1830*4500 | 26.25 | <=20 | 180 | 180 | 10-20 |
MQ1830*7000 | 26.25 | <=20 | 245 | 245 | 10-20 |
MQ1830*10000 | 26.25 | <=20 | 320 | 10-20 | |
MQ2100*3000 | 24.6 | <=20 | 210 | 210 | 15-25 |
MQ2100*4500 | 24.6 | <=20 | 245 | 245 | 15-25 |
MQ2100*11000 | 24.6 | <=20 | 570 | 15-25 | |
MQ2200*7000 | 23.7 | <=20 | 380 | 20-35 | |
MQ2200*10000 | 23.7 | <=20 | 500 | 20-35 | |
MQ2400*4500 | 22.6 | <=20 | 380 | 380 | 20-45 |
MQ2400*8000 | 22.6 | <=20 | 475 | 20-45 | |
MQ2400*10000 | 22.6 | <=20 | 630 | 20-48 | |
MQ2700*3600 | 21.4 | <=20 | 475 | 380 | 25-50 |
MQ2700*10000 | 21.4 | <=20 | 1000 | 25-50 | |
MQ3200*6000 | 19.6 | <=20 | 1000 | 30-60 | |
MQ3200*8000 | 19.6 | <=20 | 1400 | 30-60 | |
MQ3600*4500 | 18.9 | <=20 | 1250 | 35-82 | |
MQ3600*6000 | 18.9 | <=20 | 1400 | 35-82 |
Note: According to the hardness and thickness of the material, the handling capacity written above just for reference purposes only. (Refer to raw ore handling capacity)
Company introduction
Hebei Jinma Mine Machinery Group Co., Ltd. is a professional manufacturer of "Jinma" metallurgical, mine, construction material and environmental equipment assemblies. Founded in 1971 and reorganized into a joint stock enterprise in 1997, the company consists of Tangshan Mine Machinery Plant, Tangshan Jinma Construction Material Machinery Co., Ltd., Zunhua Jinma Environmental Equipment Co., Ltd. and Zunhua Jinma Mining Co., Ltd. The company covers 50 plus mu of land, with total assets of RMB90 million, some 600 employees including 96 engineering professionals and a variety of processing and testing devices, including large-size processing devices like 10t electric arc furnaces, vacuum casting tools, 8m, 5m and 4m vertical lathes, 8m, 5m and 3.15m hobbing machines, 6m planing machines, fine boring machines and medium-frequency quenching tools, and automatic welding, ultrasonic weld testers, W15-23 material testers and time-dependent vibrators totaling over 300 pieces of equipment.
FAQ to save your precious time!
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.