Copper Classifier 500mm Gold Ore Processing Equipment
Principle overview
The finely ground pulp is fed into the water tank from the feed inlet in the middle of the settlement area. The slurry gradation settlement area is under the inclined installation of the water tank. The spiral low speed rotation plays a role in stirring the pulp, making the fine particles suspended above and overflow to the overflow weir. Coarse particles sink to the bottom of the tank and are transported by a screw to the discharge port for returm sand discharge. The position of the overflow weir is higher than the bearing center at the lower end of the spiral shaft and lower than the upper edge of the spiral at the overflow end.
Features
1 Low power consumption;
2 Heavy duty, long working life;
3 Powerful self-contained spiral lifting device;④Continuous spiral raking;
4 High classifying efficiency;
Name | Copper Classifier 500mm Gold Ore Processing Equipment |
Purpose | Gold Ore Processing Equipment |
Model | Copper Classifier |
Company introduction
Tangshan Mine Machinery Factory is a specialized manufacturer that produces complete sets of equipment for metallurgy, mining, building materials, environmental protection, as well as the design and manufacture of complete sets of sand and gravel materials, and the design and manufacture of dry tailings discharge. The company was founded in 1971 and turned into a joint-stock enterprise in 1997.
Various processing and testing equipment: 8 meters, 5 meters, 4 meters vertical lathes, 8 meters, 5 meters, 3.15 meters gear hobbing machine, 6 meters planer, precision boring machine, medium frequency quenching and other larger processing equipment and automatic welding, ultrasonic welding More than 300 sets of flaw detectors, W15-23 material testing machines, aging vibration devices, etc.
FAQ
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.