100-300mm Inlet Double Roller Crusher Machine
Introduction
The MPG series sealed pair roller machine is an equipment for special industries such as rare earth materials, metal oxides, charge alloys and metal silicon. It has high energy utilization, fine and uniform crushing particle size, and can be adjusted within a certain range. Especially it has good sealing performance of the whole machine.
Name | 100-300mm Inlet Double Roller Crusher Machine |
Inlet size | 100-300mm |
Model | Double Roller Crusher Machine |
Application
This machine is mainly suitable for the crushing of various solid brittle materials with compressive strength not greater than 250Mpa and feed size not greater than 5mm. It is widely used in many special industries.
Parameter
Item Model | MPG-400×250 | Unit |
Roller Size | Φ400×250 | mm |
Feed Size | -5 | mm |
Discharging Size | -10~-40 | mm |
Production Capacity | 500~1500 | Kg/h |
Roller Speed | 120 | r/min |
Feed-type | electromagnetic vibration | |
Power | 4,4 | kw |
Outline Size | 1390×800×2200 | mm |
Weight | 1000 | kg |
Company introduction
Tangshan Mine Machinery Factory is a specialized manufacturer that produces complete sets of equipment for metallurgy, mining, building materials, environmental protection, as well as the design and manufacture of complete sets of sand and gravel materials, and the design and manufacture of dry tailings discharge. The company was founded in 1971 and turned into a joint-stock enterprise in 1997.
The company occupies more than 50 acres, with total assets of 90 million yuan and more than 200 employees, including 96 engineering and technical personnel.
FAQ to save your precious time!
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.