ZLP800 Steel Suspended Worker Platform For Wind Tower Production
It is designed particularly for heavy applications on facades, chimneys, silos, bridges etc.
The complete system consists of the working platform equipped with two electric LTD hoists and the support wheels, suspended by means of steel wire ropes from a suspension structure.
1. The main para. Of ZLP800 suspended platform:
- Rated Load: 800kgs
- Lifting Speed: 9.3m/min
- Voltage-3Phase: 380V/ (415V/220V)
- Frequency: 50Hz/60Hz
- Power: 1.8kw×2
-Hoist: LTD80
- Safety Lock: LSF309
- Dia. of Wire Rope: 4×31SW+FC-9.1mm
- Platform Size: (2.5×3)×0.76×1.45m
- Weight of Suspension Jibs: 340kg
- Weight of Lifting Part: Aluminum340kg/Steel 520kg
- Counter Weight: 1000kg
- 20’ GPQty of Package: 8