Industrial Pipe Auger Spiral Cement Tubular Screw Conveyor With Carbon Steel is consisted of conveyer body, feeding and discharging hole and driving device; the screw blade of screw conveyer has three modes: hypostatic screw surface, belt screw surface and blade screw surface. Among them, the blade screw surface is used less to transit the condensable materials with high viscosity. But this blade screw also has the function of mixing and integrating to materials. From the angle of materials displacement direction, screw conveyer can be divided into horizontal screw conveyer and perpendicular screw conveyer that are used in the horizontal transmission and perpendicular lifting to all powdery materials, granular materials and small piece materials. This screw conveyer is not suitable to be used to transit the special materials because they are easy to deteriorate and agglomerate with the characters of large viscosity, heat and pressure intolerance and strong causticity.
Model number | LSY140 | LSY160 | LSY200 | LSY250 | LSY300 | LSY400 | ||
Screw diameter(mm) | 140 | 163 | 187 | 238 | 290 | 365 | ||
Rotating speed(r/min) | 300 | 300 | 260 | 200 | 175/300 | 175 | ||
Outer diameter(mm) | 168 | 194 | 219 | 273 | 325 | 402 | ||
Max length(m) | 11 | 12 | 13 | 16 | 18 | 18 | ||
Incline degree(α°) | 0°~60° | 0°~60° | 0°~60° | 0°~60° | 0°~55° | 0°~55° | ||
Conveying capacity(t/h) | 9月17日 | 30-20 | 50-32 | 70-53 | 82-60/120-85 | 140-110 | ||
Motor | Model | L≤-7 | Y132S-4 | Y132S-4 | Y132M-4 | Y160L-6 | Y180M-4 | Y180M-4 |
Power(kw) | 5.5 | 5.5 | 7.5 | 11 | 18.5 | 18.5 | ||
Model | L>7 | Y132S-4 | Y132M-4 | Y160M-4 | Y180L-6 | Y180L-4 | Y180L-4 | |
Power(kw) | 5.5 | 7.5 | 11 | 15 | 22 | 22 |
How to Select Correct Model Tube Screw Conveyor :
1. Are you a factory or a trading company
We are a factory,and you are warmlyh welcomed to pay an on-site visit!
2. What's the accepted payment term?
T/T L/C Western union,cash and so on.
3. Can you offer the customized solution to my case?
We have R&D team who will handle your case and come up with an ideal solution
4. How long is your lead time for the machines
Normally 20 workdays after the deposit is reached.Nonstandard equipments could be longer depends on certain case
5. Are you engineers available for overseas installation and training matters?
Yes,and all the relative costs should be covered by you
How to packing and delivery machine !!!
Usually packed with seaworthy wooden box packing and we can accepted customer sepical required .