Cage type | A type 3 tier layer battery cage |
Capacity | 120 birds in one unit or one set cage |
Cage complete size | 2.2meters by 2.4meters by 1.65meters |
Each door birds capacity | 4 |
Cage surface treatment | cold galvanized or hot dipped galvanized |
Lifespan | 20 to 25 years |
Customized | yes |
Feeder trough color | white or green with new material |
Feeder material choose | PVC or metal type |
Cage mainly parts: chicken cage mesh and cage frame | |
Automatic drinking system: water tank, nipple drinker, water pipe, T connector, I connector, L connector, water thanks, filter and dosing device | |
Semi automatic feeding system: feeder trough, feeder connector, food cover |
Advantages to use layer battery cage system
1. Automatic drinking system, chicken can drink clean water and reduce birds disease
2. Easily egg collection system and when pick up eggs no need open chicken doors, save labour cost and make farm more modern
3. Easily feeding system,save feeds waste. The cage bottom mesh design a little slide, then eggs can flow to egg collection place, so people pick up eggs easily and then sell in market
4. Saving chicken house space, easily manage all chicken, make your farm more modernization. Improving egg laying rate and healthy drinking
5. Easily to clean chicken droppings and people can build dung pit. And reduce the occurrence and spread of diseases
Frequently ask questions
Q: When will the goods be delivered after payment?
A: Production and delivery will be arranged according to the order requirements within 7-14 days after the deposit is paid
Q: What is the quality assurance for purchasing your chicken cage?
A: Free replacement of naturally damaged accessories within 2 years to ensure that the cage will not deform or rust within 5 years
Q: How soon can I receive the goods?
A: Production delivery takes 7-14 days, customs clearance takes 7-14 days, plus Shanghai shipping time, the goods can be received within about 3 months after the order is placed
Q: What is the payment method?
A: 40% deposit starts production and delivery, and the balance payment is paid after receiving the scanned bill of lading from the shipping company