Specifications
Brand Name :
Dehai Boiler
Model Number :
Boiler Header
Certification :
ISO9001 , SGS , ABS , ASME
Place of Origin :
China
MOQ :
5 Tons
Price :
Negotiable
Payment Terms :
L/C, T/T
Supply Ability :
500 Tons / Month
Delivery Time :
50 Days
Packaging Details :
Seaworthy packing
Type :
Boiler spare parts
Pressure :
High Pressure
Material :
Carbon Steel
Output :
Hot Water / Steam
Fuels :
Coal / Oil / Biomass
Usage :
Industrial
Description
High Quality Industry Boiler Pressure Part Tubes Boiler Drum Header Boiler Pressure parts

High Quality Boiler Pressure Part description

1. The main function is to collect the working medium, or redistribute the working medium to other pipelines through the collecting box, that is, to collect, mix and distribute the working medium, so as to guarantee the uniform distribution and uniform heating of working medium.

2. The lower collector box, also known as the coke proof box, is located on both sides of the grate and directly in contact with the burning coal seam. The purpose of the lower collector box is to cool coke forming slag and not stick to the side wall.


Materials


1. Carbon steel:20G,SA-106B,SA-106C,etc.
2. Low-alloy thermal resistant steel:15CrMoG,12Cr1MoVG,SA-335P12,SA335-P22,etc.
3. Middle-alloy thermal resistant steel:SA-335P91,etc.
4. Special material(ultra-supercritical):SA-335P122,SA-335P92,etc.

Features

1.Headers form an important part of all types of boilers. Steam from the generating tubes is collected in headers which are therefore always under pressure. This pressure may vary from 300 psi to 2000 psi.

2. Since headers are always under pressure, the utmost care is taken by us while fabricating them. Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the headers
3. Bevelling and weld preparation of stubs duly tack-welded to the main body of the header are first shown to Chief Inspector of Boilers for his approval and once again the stubs fully welded with main body are shown to Chief Inspector of Boilers under hydraulic pressure, varying from 1000 to 3000 psi as required by the specifications.
4. The headers are stamped by Chief Inspector of Boilers before they leave our manufacturing plant. We also weld skubolets and weldolets in place of stubs.

Specification

Materials Stainless Steel
Type header body, end cover, tube joint, hand cole, thermometer socket;seamless steel tube, pressure parts
Advantages advanced welding, safe and reliable operation
Brand Zhangjiagang Dehai Boiler
Remarks Customized order is also accepted.

Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD) 76mm~914mm

Perfect welding

Pressure Part Steam Tubes Header Easy Maintain Safe Reliable Operation

Send your message to this supplier
Send Now

Pressure Part Steam Tubes Header Easy Maintain Safe Reliable Operation

Ask Latest Price
Brand Name :
Dehai Boiler
Model Number :
Boiler Header
Certification :
ISO9001 , SGS , ABS , ASME
Place of Origin :
China
MOQ :
5 Tons
Price :
Negotiable
Contact Supplier
Pressure Part Steam Tubes Header Easy Maintain Safe Reliable Operation
Pressure Part Steam Tubes Header Easy Maintain Safe Reliable Operation
Pressure Part Steam Tubes Header Easy Maintain Safe Reliable Operation

Zhangjiagang Dehai Boiler Co., Ltd

Active Member
6 Years
Since 1998
Business Type :
Manufacturer, Exporter
Total Annual :
30,000,000.00-50,000,000.00
Employee Number :
300~500
Certification Level :
Active Member
Contact Supplier
Submit Requirement