Specifications
Brand Name :
HD BOILER
Model Number :
Heat parts
Certification :
ISO9001 , SGS , TUV , ASME , EN
Place of Origin :
China
MOQ :
1 set
Price :
Negotiable
Payment Terms :
L/C, T/T, Western Union
Supply Ability :
1500 Tons / Month
Delivery Time :
50 ~ 100 Days
Packaging Details :
Seaworthy packing
Condition :
New
Manufacturing Level :
A
Structure :
Fire / Water Tube
Pressure :
High / Low Pressure
Fuel :
Coal / Gas / Oil-fired / Water Heat
Dimension :
Customization
Style :
CFB Boiler
Weight :
10~1000 tons
Description

Convection Superheater Coils Steam Super Heater and Reheater In Boiler Anti Corrosion Thermal Power Plant

Description

Superheater

Fossil fuel power plants often have a superheater section in the steam generating furnace.The steam passes through drying equipment inside the steam drum on to the superheater, a set of tubes in the furnace. Here the steam picks up more energy from hot flue gases outside the tubing, and its temperature is now superheated above the saturation temperature.

Reheater

Power plant furnaces may have a reheater section containing tubes heated by hot flue gases outside the tubes. Exhaust steam from the high-pressure turbine is passed through these heated tubes to collect more energy before driving the intermediate and then low-pressure turbines.

Differences

Type Advantages Disadvantages Supporting method
Pendant-type 1.Firm structural support 1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom. supported from above
Inverted-type 1.Proper drainage of the condensed steam 1. Lack the structural rigidity, especially in high speed gas flow Supported from below
Horizontal -type

1. Proper drainage

2. Good structural rigidity.

1. They do not view the flam directly so they are mainly from the convective type Usually supported in the vertical gas ducts parallel to the main furnace.

Function

Superheater is to increase the temperature of the steam above its saturation point.

Reheater is basically a superheater that superheats steam exiting the high-pressure stage of a turbine. The reheated steam is then sent to the low-pressure stage of the turbine. By reheating steam between high-pressure and low-pressure turbine it is possible to increase the electrical efficiency of the power plant cycle beyond 40%.The reheat cycle is used in large power boilers since it is feasible economically only in larger power plants.

Testing Equipment

Convection Superheater Coils Steam Superheater And Reheater In Boiler Thermal Power Plant
Convection Superheater Coils Steam Superheater And Reheater In Boiler Thermal Power Plant

Company Introduction

Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

1. Fabrication area of 200,000 square meters

2. 150 Engineers

3. 600 Coded welders

4. 60 Licensed Inspectors(NDT Level-III instructors)

5. Class-A Licenses for Design and Manufacture Boiler

6. ISO 9001:2008 Quality System

7. ASME Certificate of Power Boilers

8. ASME 'S','U' and NB stamp authorization

Convection Superheater Coils Steam Superheater And Reheater In Boiler Thermal Power Plant

Send your message to this supplier
Send Now

Convection Superheater Coils Steam Superheater And Reheater In Boiler Thermal Power Plant

Ask Latest Price
Brand Name :
HD BOILER
Model Number :
Heat parts
Certification :
ISO9001 , SGS , TUV , ASME , EN
Place of Origin :
China
MOQ :
1 set
Price :
Negotiable
Contact Supplier
Convection Superheater Coils Steam Superheater And Reheater In Boiler Thermal Power Plant
Convection Superheater Coils Steam Superheater And Reheater In Boiler Thermal Power Plant
Convection Superheater Coils Steam Superheater And Reheater In Boiler Thermal Power Plant
Convection Superheater Coils Steam Superheater And Reheater In Boiler Thermal Power Plant

Zhangjiagang HuaDong Boiler Co., Ltd.

Verified Supplier
9 Years
jiangsu
Since 1985
Business Type :
Manufacturer, Trading Company
Total Annual :
100,000,000-120,000,000
Employee Number :
1000~1100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement