Industrial Steam Boiler Manifold Headers With Longitudinal Welded Pipe ASME Standard
Product Description
Boiler headers, or boiler manifolds are designed to simplify piping near the boiler, reduce installation time, labor costs and parts used. Available in various branch options with threaded inlet and outlet connections. For closed loop heating applications only.
The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.
Technical Parameter
Materials | Stainless Steel |
Type | header body, end cover, tube joint, hand cole, thermometer socket;seamless steel tube, pressure parts |
Advantages | advanced welding, safe and reliable operation |
Brand | Jinan Yuanda |
Remarks | Customized order is also accepted. |
Test standard
JB/T3375 Boiler Material Instocking Acceptance Rules.
JB/T1610Technical Conditions of Boiler Hinders Manufacturing.
JB/T1613Technical Conditions of Boiler Pressure Parts Welding.
JB/T1612Technical Conditions of Boiler Water Pressure Test.
Product Category
The boiler headers have water wall header,superheater header,economizer header and so on. It acts action of gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.
Construction
Header construction is basically a miniature version of a simple steam drum (diameters are smaller than the ones of steam drums). However, in headers there are usually no internals except the orifices in forced circulation and once-through principle boilers. Small diameter headers are constructed from a tube with welded front and end plates, whereas the big headers are made of bent steel plates in the same way as steam drums.
Quality Control
1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.
3. X-ray, γ-ray and liquid penetrant test inspection report to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.
Boiler Parts
Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube.
Name&Type | Supply Ability |
Boiler drum | 100Ton/Tons per Month |
Boiler header | 100Ton/Tons per Month |
Boiler waterwall panel | 500Ton/Tons per Month |
Boiler economizer | 500Ton/Tons per Month |
Boiler super heater | 300Ton/Tons per Month |
Boiler air preheater | 300Ton/Tons per Month |
Other | 300Ton/Tons per Month |
Company Introduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.