Specifications
Brand Name :
HD Boiler
Model Number :
Boiler economizer
Certification :
ASME, ISO9001:2015, ISOEN3834
Place of Origin :
China
MOQ :
3 TONS
Price :
negotiable
Payment Terms :
30% after contract and balance 70% before shipment, or 100% L/C at sight
Supply Ability :
100 tons/Month
Delivery Time :
Depands on Qty
Packaging Details :
Iron frame Packing
Pressure :
Low/High Pressure
Material :
Carbon Steel/Stainless Steel
Type :
Horizontal
Inlet Temperature :
150-300℃
Boiler Capacity :
1T-10T
Operation :
Natural Circulation/Force Cirulation
Application :
Boiler System
Usage :
Power Station
Description

SA-210C Low Pressure Spiral Fin Tube Boiler Economizer For Improving Boiler Performance

Product Description

The economizer is the heating surface of the boiler feed water heated into saturated water under drum pressure in the flue at the tail of the boiler, which reduces the exhaust gas temperature of the flue gas due to the heat it absorbs from the low-temperature flue gas, saves energy and improves efficiency. The economizer consists of a horizontal arrangement of parallel elbow pipes (commonly known as serpentine pipes). Boiler economizer is a device installed at the tail of the boiler for the recovery of waste heat. It is mainly suitable for industry, and in recent years, it has also been popularized in agriculture and some related industries. The economizers produced in our factory are mainly used in the boilers of large power stations.

SA-210C Low Pressure Spiral Fin Tube Boiler Economizer For Improving Boiler Performance

Parameters

Description

Boiler economizer

Material

Alloy steel, Carbon steel, SA210C ,SA213T22, etc.

Material standard

ASTM, EN or ISO etc.

Dimension

Customization

Weight

Min: 10 ton

Max.:1000 ton

Smelting Process:

EF+LF + VD

Process

Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection

UT standard

ASTM A388 or EN10228, etc

Features

  • Brand Name: HD Boiler
  • Model Number: Boiler Economizer
  • Place of Origin: China
  • Certification: ASME, ISO9001:2015, ISOEN3834
  • Minimum Order Quantity: 3 TONS
  • Price: negotiable
  • Packaging Details: Iron frame Packing
  • Delivery Time: Depends on quantity
  • Payment Terms: 30% after contract and balance 70% before shipment, or 100% L/C at sight
  • Supply Ability: 100 tons/month
  • Material: Carbon Steel
  • Placement: Before ESP or Before FGD
  • Packing: Iron Frame Package
  • Usage: Power Station
  • Inlet Temperature: 150-300℃

Function

1. Absorb the heat of low-temperature flue gas, reduce the exhaust temperature, reduce the exhaust loss, and save fuel.

2. Because the feed water is heated in the economizer before entering the steam drum, the heat absorption of the feed water on the heating surface is reduced, and the economizer can be used to replace part of the evaporation heating surface with high cost.

3. When the feed water temperature increases, the wall temperature difference will be reduced when it enters the steam drum, and the thermal stress will be reduced accordingly, prolonging the service life of the steam drum.

Energy-saving principle

Add a reheating process to the cycle. Increase the average temperature of endothermy. This increases the efficiency of the cycle. During the start-up process of the boiler (drum boiler), because the circulation of its steam-water pipeline is not established, that is, the boiler feed water is in a stagnant state, and the water in the economizer is in a state of non-flow at this time. With the strengthening of boiler combustion and the increase of flue gas temperature, the water in the economizer is easy to vaporize, so that the part of the economizer is in an overtemperature state. In order to avoid this situation, a pipe is connected from the centralized sewer pipe of the steam drum to the inlet of the economizer as a recirculation pipe, so that the water in the economizer is in a flowing state to avoid its vaporization.

Packaging and Shipping

Boiler Economizer will be packaged using high-quality materials to ensure the safety and protection of the product during transportation. The packaging materials will be sturdy and durable, able to withstand rough handling and long-distance shipping.

The product will be carefully packed and cushioned to prevent any damage during transit. It will also be labeled with clear instructions and handling guidelines for easy identification and handling.

For shipping, we will use reliable and reputable carriers to ensure timely delivery of the product to our customers. We offer various shipping options depending on the destination, including air, sea, and land transportation.

Our team will also provide tracking information for customers to track their orders and ensure a smooth delivery process. We are committed to delivering the Boiler Economizer in perfect condition and on time.

Thank you for choosing our product. We look forward to providing you with the best packaging and shipping experience for your Boiler Economizer.

SA-210C Low Pressure Spiral Fin Tube Boiler Economizer For Improving Boiler Performance

Why Choose Our Boiler Economizer?

  • High-quality stainless steel material for durability
  • Innovative design for maximum energy savings
  • Easy installation and maintenance
  • Advanced control systems for efficient operation
  • Suitable for various types of power plants
  • Handles high inlet temperatures

Contact Us

If you are looking for a reliable and high-quality Boiler Economizer, look no further than HD Boiler. Contact us today to learn more and to place your order!

FAQ

  • Q: What is the brand name of this product?

A: The brand name of this product is HD Boiler.

  • Q: What is the model number of this product?

A: The model number of this product is Boiler economizer.

  • Q: Where is this product made?

A: This product is made in China.

  • Q: What certifications does this product have?

A: This product is certified by ASME, ISO9001:2015, and ISOEN3834.

  • Q: What is the minimum order quantity for this product?

A: The minimum order quantity for this product is 3 tons.

  • Q: Is the price negotiable for this product?

A: Yes, the price for this product is negotiable.

  • Q: How is this product packaged?

A: This product is packaged in iron frames.

  • Q: What is the delivery time for this product?

A: The delivery time for this product depends on the quantity ordered.

  • Q: What are the payment terms for this product?

A: The payment terms for this product are 30% after contract and balance 70% before shipment, or 100% L/C at sight.

  • Q: What is the supply ability for this product?

A: The supply ability for this product is 100 tons per month.

Send your message to this supplier
Send Now

SA-210C Low Pressure Spiral Fin Tube Boiler Economizer For Improving Boiler Performance

Ask Latest Price
Watch Video
Brand Name :
HD Boiler
Model Number :
Boiler economizer
Certification :
ASME, ISO9001:2015, ISOEN3834
Place of Origin :
China
MOQ :
3 TONS
Price :
negotiable
Contact Supplier
video
SA-210C Low Pressure Spiral Fin Tube Boiler Economizer For Improving Boiler Performance
SA-210C Low Pressure Spiral Fin Tube Boiler Economizer For Improving Boiler Performance
SA-210C Low Pressure Spiral Fin Tube Boiler Economizer For Improving Boiler Performance
SA-210C Low Pressure Spiral Fin Tube Boiler Economizer For Improving Boiler Performance

Zhangjiagang HuaDong Boiler Co., Ltd.

Verified Supplier
9 Years
jiangsu
Since 1985
Business Type :
Manufacturer, Trading Company
Total Annual :
100,000,000-120,000,000
Employee Number :
1000~1100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement