Is a superheater a boiler?
Working Progress
1. The separated steam is drawn out from the top section of the drum and distributed for process.
2. Further heating of the saturated steam will make superheated steam normally used to drive a steam turbine.
3. Saturated steam is drawn off the top of the drum and re-enters the furnace in through a superheater. 4. The steam and water mixture enters the steam drum through riser tubes, drum internals consisting of demister separate the water droplets from the steam producing dry steam.
5. The saturated water at the bottom of the steam drum flows down through the downcomer pipe.
Diameter(OD) | ¢76mm~¢914mm |
Length(Max) | 23000mm |
Temperature(℃) | 300~1500 |
Brand | SAT-CHAM |
Application:
air cooler, fired heater, heat exchanger, marine boiler, economizer, power plant boiler, HRSG boiler, waste heat recovery unit, air heater etc
Characteristic:1.Anti-corrosion2.Anti-wear3.Lower contact resistance 4.Higher Stability
Our products can be modified according to our customers' needs and the situation.we design and manufacture safe,reliable and efficient H-fin tubes.it has also completed stand-alone product quality assurance systems.Production of H-fin tubes are with high heat transfer efficiency, they have flue gas resistance and are designed for a small space.
Technical parameters | The high degree of fin 0-16mm(or outside diameter of fin φ25-φ75); Pitch of fins 2.0-5.0mm; Length of finning tube 0.5~ 14m. |
Single metal rolling finning tube | Pure aluminum 1060 or aluminum alloy 6063,6061. Outside diameter Shall be less than 40mm |
Double metal rolling finning tube | Tube-based protection from the outer layer of aluminum tubes,corrosion-resistant,Tube-based can be made of carbon steel pipe,in addition to,stainless steel tube and copper tube can also be used, as well as titanium alloy tube |
Package | The aluminum finned tubes are well packed in plastic film in the inner and steel fram in the outer |
Q1: How long is the warranty period?
We provide 18 months warranty for all spare parts(exclude fragile parts).
Q2: How can we guarantee quality?
1 All machines are in strict accordance with the ISO quality and CE system requirements.
2 Each procedure is crafted by professional Skilled labour, followed by particular QC
3 All information of our products can be checked in efficient management system.
Q3: What can you buy from us?
Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall,
Boiler manifold headers and other pressure spare parts.
Q4: What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.
Q5: Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.
We offer pickup service at Shanghai for your visit.