High Quality TP304L Seamless Boiler Tubes ASTM A179 A213 T9-T12
Packaging & Delivery
- Packaging Details
- Bundle or Bulk for pipe size bigger than 8''
- Lead Time :
-
Quantity(Tons) | 1 - 5 | 6 - 25 | 26 - 100 | >100 |
Est. Time(days) | 30 | 30 | 35 | To be negotiated |
-
QUALITY CONTROL
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
-

item | value |
Standard | DIN 1626, DIN 1629/3, DIN EN 10216-1-2004, DIN EN 10208-1-1998, DIN 1630, DIN 2448, ASTM A106-2006, ASTM A53-2007, ASTM A234-2007, ASTM A53M-2007, ASTM A513-2007, ANSI A789-2001, ASTM A335M-2006 |
Grade | Q235, Q345, Q195, Q215, 16mn, A53(A,B), A106(B,C), A312, A335 P9, A179-C, A315, API J55 |
Thickness | 2mm - 50mm |
Section Shape | Round |
| 2mm - 60mm |
Place of Origin | China |
Application | Oil Pipe, Gas Pipe, Fluid Pipe |
Technique | Hot Rolled |
Certification | API |
Surface Treatment | Painting |
Alloy Or Not | Non-Alloy |
Tolerance | ±5% |
Type | Seamless Steel Pipe |
Processing Service | Bending, Cutting, Grooved Ends, Threaded Ends |
Product name | Seamless Steel Pipe |
Surface | Customers't Requirement |
Ends | Beveled+Thread+Couplings |
Keyword | Carbon Tube |
Packing | Buddle |
Steel Grade | ASTM |
Product Description
Boiler Parts
Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube.
Name&Type | Supply Ability | FOB Price |
Boiler drum | 100Ton/Tons per Month | Contact Me Get Latest Price |
Boiler header | 100Ton/Tons per Month | Contact Me Get Latest Price |
Boiler waterwall panel | 500Ton/Tons per Month | Contact Me Get Latest Price |
Boiler economizer | 500Ton/Tons per Month | Contact Me Get Latest Price |
Boiler super heater | 300Ton/Tons per Month | Contact Me Get Latest Price |
Boiler air preheater | 300Ton/Tons per Month | Contact Me Get Latest Price |
Other | 300Ton/Tons per Month | Contact Me Get Latest Price |
