ASME SA210 Low Carbon Steel Boiler Tubes / Seamless Boilerpipe Cold Drawn
PRODUCT | ASME SA210 Low Carbon Steel Boiler Tubes / Seamless Boilerpipe Cold Drawn | ||
Material | ST52, ST35, ST42, ST45, X42, X46, X52, X56, X60, X65, X70 | ||
Standard | API SPEC 5L, ASTM A 53M, ASTM A 106M, | ||
Surface | Black paint, varnish, oil, galvanized | ||
Pipe Length | Fixed length, random length or as required | ||
Pipe Ends | Plain Ends, Beveled Ends | ||
End Protector | 1. Plastic caps (small OD) 2. Iron protector (large OD) | ||
Application | Fluid pipe, oil pipe, gas pipe, structure pipe, boiler tubes | ||
Test | Chemical Component Analysis, Mechanical Properties, Technical Properties, Exterior Size Inspection, Hydro static Test, X-ray Test. | ||
Productivity | 20000 tons per month | ||
Min Order | 10 ton | ||
Remark | Special design available according to requirement |
ASTM A210/A210M/ASME SA-210/SA-210M
ASTM A 210 Cold Drawn Seamless Medium-Carbon Steel Boiler and Superheater Tubes
ASTM A 210 Cold Drawn Seamless Medium-Carbon Steel Boiler and Superheater Tubes Mechanical Property
Established in 1985, Zhang Jiagang Huadong Energy Technology Co. is a dependable provider of industrial grade boiler components for boiler project contractors and large-scale boiler manufacturing companies. Some of our primary products include boiler steel drums, economizers, superheaters, water wall tubing, boiler header manifolds, and other heating surface components. We emphasize safety and quality above all else when designing and manufacturing our boiler products. Our components operate under high temperature and pressure and therefore, need to be designed meticulously to guarantee performance and safety. As a result of our outstanding production capabilities, we have been recognized by the American Mechanical Engineering Association and have been certified by ASME. Contact us today to learn more.
Name&Type | Supply Ability | FOB Price |
Boiler drum | 100Ton/Tons per Month | Contact Me Get Latest Price |
Boiler header | 100Ton/Tons per Month | Contact Me Get Latest Price |
Boiler waterwall panel | 500Ton/Tons per Month | Contact Me Get Latest Price |
Boiler economizer | 500Ton/Tons per Month | Contact Me Get Latest Price |
Boiler super heater | 300Ton/Tons per Month | Contact Me Get Latest Price |
Boiler air preheater | 300Ton/Tons per Month | Contact Me Get Latest Price |
Other | 300Ton/Tons per Month | Contact Me Get Latest Price |
Zhang Jiagang Huadong Boiler Co., Ltd.
Add: No.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
E-mail: yolanda@boilerfabrication.cn