Specifications
Brand Name :
ORL Power
Model Number :
Customization
Certification :
ISO9001/SGS/TUV/ASME/EN
Place of Origin :
Zhangjiagang,Jiangsu,China
MOQ :
1 Set/Sets 10tons
Price :
Contact me | Get Latest Price
Payment Terms :
T/T
Supply Ability :
500Ton/Tons per Month
Delivery Time :
50~100 Days
Packaging Details :
Iron Frame Package
Condition :
New
Type :
Natural Circulation/Once Through
Usage :
Industry / Power Station
Structure :
Fire、Water Tube
Pressure :
High、Low Pressure
Style :
CFB Boiler
Fuel :
Coal / Gas / Oil-fired, Water Heat
Output :
Hot Water/Steam
Dimension(L*W*H) :
Customization
Weight :
10~1000ton
Keywords :
boiler Superheater
Color :
Customer's requirement
Description

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

CFB Boiler Superheater

The Steam Superheater is a coil type heat exchanger which is used to produce superheated steam or to convert the wet steam to dry steam, generated by a boiler. It is different from a boiler in a way that, boiler utilizes both sensible heat as well as latent heat to convert water into steam while superheater utilizes only sensible heat to superheat the steam in order to increase its enthalpy.

Specifications

Description Superheater
Material Alloy steel, Carbon steel etc.
Material standard ASTM, EN or ISO etc.
Structure Type Tube Coil
Dimension Customization
Supply ability 500 ton per month
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Bending tube→Assembly→Inspection →RT→Heat treatment (annealing)→Hydraulic pressure test→Painting→ Packaging
Thermal Efficiency Around 95%

Boiler Parts

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

Name&Type Supply Ability: FOB Price
Boiler drum 100Ton/Tons per Month Contact Me Get Latest Price
Boiler header 100Ton/Tons per Month Contact Me Get Latest Price
Boiler waterwall panel 500Ton/Tons per Month Contact Me Get Latest Price
Boiler economizer 500Ton/Tons per Month Contact Me Get Latest Price
Boiler super heater 300Ton/Tons per Month Contact Me Get Latest Price
Boiler air preheater 300Ton/Tons per Month Contact Me Get Latest Price
Other 300Ton/Tons per Month Contact Me Get Latest Price

Boiler Parts

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

Contact Information

ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China

Phone:+86 0512-56770166

E-mail: orl@orlpower.com

Website: http://www.orlpower.com

Boiler Parts

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

Company Information

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

Product Description

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

Boiler Parts

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

Production Workshop

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

Boiler Product Production

Boiler Cyclone Separator WorkShop, Boiler Coil Workshop, Boiler Waterwall Workshop.

Testing Center

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

Boiler Product Test

Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

Packaging & Shipping

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

Certifications

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

Company Business

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

Our products have been wildly used in power plants and large international companies overseas.

Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc.

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

Trading Process

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

FAQ

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.


Send your message to this supplier
Send Now

Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

Ask Latest Price
Watch Video
Brand Name :
ORL Power
Model Number :
Customization
Certification :
ISO9001/SGS/TUV/ASME/EN
Place of Origin :
Zhangjiagang,Jiangsu,China
MOQ :
1 Set/Sets 10tons
Price :
Contact me | Get Latest Price
Contact Supplier
video
Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency
Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency
Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency
Boiler Unit CFB Boiler Superheater Platen Superheater High Heating Efficiency

Suzhou orl power engineering co ., ltd

Active Member
9 Years
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
$5000000-$10000000
Employee Number :
500~600
Certification Level :
Active Member
Contact Supplier
Submit Requirement