Features:
1. Stable performance with advanced PLC.
2. Automatic preform conveyer to save human cost.
3. Preform self-rotation and infrared pre-heater revolution assure the even distribution of heat, which improve the bottle shaping rate, increase the production.
4. High adjusting performance to enable preheat the preforms perfectly by adjust the voltage control area in the PLC, which could adjust the temperature of the infrared lights in the pre-heater, and keep the proper temperature and humidity invariable.
5. High safeties with security automatic-locking device in each mechanical action, which will make the production into a perfect safe environment, in case of the breakdown in certain procedure.
6. Introduce the FESTO air cylinder to avoid contamination and noise.
7. Satisfaction with different atmospheric pressure for blowing and mechanical action by dividing the blowing and action into three parts in the air pressure diagram of the machine.
8. Strong clamping force with high pressure and double crank links to lock the mould.
9. Safe and reliable and unique design of the position of valve to make the pneumatic diagram in the machine easier to understand.
10. Low cost,high efficiency,easy operation and maintenance etc, profited from the fully automatic technological process.
11. Easy for you to install/test and start up.
Technique parameters
Model | RM-9B | |
Container | Product material | PET |
Volume | 0.1L-2.0L | |
Theoretical output | 1800-2000PCS/H | |
Preform length | 15mm-400mm | |
Preform inner diameter | Φ10mm-160mm | |
Moulding | Max.mould plate Dimenstion(L x W) | 400x460mm |
Max.mould thickness | 300mm | |
Clamping force | 65KN | |
Mould opening stroke | 28mm | |
Machine size and weight | Main machine (L x W x H) | 175*67*186cm |
Main machine weight | 600Kg | |
Heater (L x W x H) | 187*63*145cm | |
Heater weight | 250Kg | |
Power | 17.5kw |
Customer's service:
1. Providing turn-key project for you, only you have any idea to start beverage factory plant.
2. Having a professional design team, our engineer can draw bottle samples and flow chart of workshop for you .
3. Giving you the best quotation for all kinds of beverage production, only you can tell me which kind of drink you want to product, what is your capacity(how many bottles one hour) what is you bottle material, pet or glass,etc
After service:
1. We send the engineers to help installing, commissioning and training, the engineers start from our factory area.
2. We supply below necessary documents with the machine:
a. Machine layout
b. Electricity diagram
c. Machine certificate
d. General manual book/maintenance book
1. Payment terms:
30% by T/T as down payment within 7 days the contract signed
70% by T/T paid before delivery
2. Mechanical Warranty:
One year warranty and come with at least one year recommended spare parts
3.Delivery & Packing:
Delivery Time: 30 days after get down payment & bottle/label samples
4.Providing Document:
1) Machine Quality Guarantee
2) Complete set install & maintain instruction Book in English language
3) Complete Document for customer to clear its custom
5.Packaging requirement:
1) The special packaging box is according to the immunity standard in China,it suits for long-distance transport, damp proof, rustproof, land way and seaway
2) Transportation ways: Sea transportation
6.Install in Spot
If Engineers install in spot
1) Installment USD100/day. Person as allowance
2) Training fee is free for customer workers within the installation period
3) The tickets from China to the customer factory and return paid by the customer
4) The local housing,food, and transfer cost at customer factory paid by the customer
If you have any problem,pls let us know.