50bpm automatic PET plastic / glass / jam rotary bottle rinser / washing / rinsing machine / equipmen
Principle:
The bottles will be taken into rinser by conveyor, the dia plate will turn each bottle to be caught by spring clamp, with driven energy of motor, the spring clamps will go forward a circle along main axis, the bottles will be reversed 180°,bottle mouths will be facing to floor, and at the meantime, spray water value will be open and clean pressure water will spray inside bottles, with the water fall down, dirty inside bottles will be taken away. Then the cleaned bottle will be turned 180°again and sent into next machine station.
The whole machine is made of SUS304. The spring clamp is by Italian design, can be slightly adjustable according to bottle neck size difference and can protect bottle neck. And water spray system is from American, make sure water spray averagely. Easy for clean and maintenance.
Capacity | 0-3000BPH(each bottle rinsing time 4s) |
Washing positions | 12 |
Weight | 700kg |
Power | 0.92kw |
Dimension | 1050*950*1700mm |
Applicable bottle | |


1.Installation & adjustment (PET bottle washing machine)
After the equipment are arrived at the customer’s site, the customer is responsible for unpacking and arranging the equipment according to the placement drawing; and does under our install-adjust technicians’ guidance. Costs of the staff are decided at last.
2.Training
1)We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance.
2)The buyer can send staff to our company for learning.
3.Quality assurance
1)We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.
2)We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
3)We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
4)The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.
4.Warranty
Offer 12 months maintenance period to the problem that caused by our design, manufacture and the material quality, and offer the relevant parts and effective service for free for above reason. We will offer a widely and favorable technical support, after service all the time after guarantee period.