Specifications
Brand Name :
Herrman
Model Number :
CEB-05
Certification :
ISO9001
Place of Origin :
Anhui,China
MOQ :
10 sets
Price :
Negotiable
Payment Terms :
L/C, T/T, D/P
Supply Ability :
3000 Piece/Pieces per Month
Delivery Time :
About 20 days after receiving deposit
Packaging Details :
In carton ,carton size :151*26*92cm
Max speed :
30-50km/h
Range :
45-60km(PAS)
Charger time :
4-6 hours
Wheel size :
26“
Battery :
36V/10Ah Lithium battery
Display :
LED Display
Description

Intelligent Brushless Controller City Electric Bicycle/E-bike with Light Weight High Speed Brushless Geared Hub Motor

Motor

Light weight high speed brushless

Geared hub motor

36V 180w 8fun front motor

Battery 36V/10Ah Lithium battery
Controller intelligent brushless
Display LED display with 3 assist level
PAS 1:1 pedal assistant system
Charger AC 100V -240V 2amps smart charger
Charger time 4-6 hours
Max speed 25km/h(EU),32km/h(USA&Canada)
Range 45-60km(PAS)
Max load 125kgs
Gross weight 25kgs
Net weight 23kgs
Carton size 151*26*92cm
Quantity 84 pcs (20Ft),150 PCS(40Ft)
Main Components
Frame Aluminium alloy
Tyres 700C*40C Kenda tyre
Rim Al alloy double wall,CNC side wall
Front brake Tektro V brake
Rear brake Shimano Roller brake
Speed gears SHIMANO nexus 8 speed
Handlebar Al alloy,ZOOM Brand
Stem Al alloy,ZOOM Brand
Brake lever Tektro brand with power off switch
Chain KMC stainless
Chain Wheel Alloy 38T,Al alloy crank
Mudguard Al alloy
Rear rack Al alloy
Saddle Soft comfortable,SR brand
Pedal Al alloy
Front fork Al Alloy with suspension,RST brand


City Electric Powered Bike With Light Weight Intelligent Brushless Controller

FAQ:

Q: Why should I recharge my batteries at least every 90days (Li-ion) when I'm not using them ?

A: Batteries naturally loose their charge over time. To keep the batteries in optimal condition and extend their life. It's recommended that a top-off recharge be performed at least every 90 days.

Q: What happen if I leave the power switch on longer than 5 minutes?

A: If you have left the power switch on or your product has not been charged for a long period of time, the batteries may reach a stage at which it will no longer hold a charge.

Q:Will I get more performance from my bike if I leave the batteries to charge longer?

A:No,once the batteries are fully charged(as indicated by the light on the charger) it is best to unplug them from the charger. Leaving the batteries charging longer than necessary is called overcharging and will not increase performance. Currie-supplied chargers are designed to avoid over-charging a battery. Still we recommend that you always unplug a charger after the unit is fully charged to avoid the possibility of unanticipated circumstances such as an unexpected power surge from a lighting strike (or other power line anomaly) protentially causing damage. Only use Currie-supplied chargers.

Send your message to this supplier
Send Now

City Electric Powered Bike With Light Weight Intelligent Brushless Controller

Ask Latest Price
Brand Name :
Herrman
Model Number :
CEB-05
Certification :
ISO9001
Place of Origin :
Anhui,China
MOQ :
10 sets
Price :
Negotiable
Contact Supplier
City Electric Powered Bike With Light Weight Intelligent Brushless Controller

Anhui Herrman Impex Co.,Ltd

Active Member
7 Years
anhui, hefei
Since 1994
Business Type :
Manufacturer, Exporter, Trading Company, Seller
Total Annual :
20,000,000.00-50,000,000.00
Employee Number :
20~100
Certification Level :
Active Member
Contact Supplier
Submit Requirement