Specifications
Place of Origin :
Shandong, China
Brand Name :
BOYOUN
Model Number :
Formwork System
Supply Ability :
60000 Ton/Tons per Year
Packaging Details :
Standard or according to your requirement
MOQ :
50 Ton/Tons
Price :
Negotiable
Certification :
SGS; ISO
Material :
Steel
Application :
Concrete Construction
Type :
Recyclable
Usage :
Concrete Construction Support
Certificate :
ISO9001
Size :
Non-standard:custom-made
Port :
Tianjin /Qingdao
Description
Hot sale precasted Box Girder concrete steel modular formwork systems with factory price

Segment casting yard components

1. Short-Line Match Casting and Casting Mould Units
2. Production and Working Space
• Rebar Assembly
• Prestressing Work
• Segment Touch-up/ Repair
• Ready-mixed Concrete Plant
3. Lifting Equipments
4. Storage Area

What is precast segmental box girder

The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.

Advantages and Benefits

1. Construction Simplicity
• easier installation of external post-tensioned tendons

2. Time Savings/Cost Effectiveness
• precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• by using efficient erection method and equipment, the rapid installation of viaduct can be achieved.

3. Quality Control Q - A/QC
• precast segment to be produced in factory-manner condition w/ good quality control.
• minimum interruption natural impacts such as bad weather, rain.
• minimum waste of material
• good precision in production
4. Inspection and Maintenance
• external prestressing tendons can be easily inspected and repaired if required.
• maintenance program can be scheduled.

Key componets

1. Casting Yard and Segment Production
(Geometry Control Program and Software)
2. Segment Erection/ Installation and Equipments

ABOUT US

BOYOUN HEAVY INDUSTRIES

Boyoun, founded in 2005, is one of China's leading manufacturers of formwork and scaffolding. In addition to the plant in Binzhou city, Shandong province, China, 6 rental bases across China mainland are operated. At Boyoun we offer various formwork, climbing, shoring and scaffolding solutions - for sale and rental - in residential and commercial high-rise construction, bridge and road engineering.

The company's annual production capacities now are increased to 50,000 tons of formwork, scaffolding and mechanical equipment. Meanwhile we also provide 40,000 tons of required formwork and scaffolding materials for rental in the last year. The company employs over 400 employees now and has a sales office in Beijing. And we continue to expand to many countries rapidly, including The United Arab Emirates, Malaysia, Singapore, Pakistan, Russia, South Africa, Brazil, America.

Boyoun is constantly developing and improving, always on the lookout for advantageous, new materials and unconventional solutions. On the basis of ISO 9001 and ISO 14001, all Boyoun products comply with the most stringent requirements in terms of quality and environment.

Our international management stands for in-depth expertise. With the knowledge and understanding of local requirements, the right formwork and scaffolding systems are developed to meet all needs worldwide.Our goal is to be even closer to our customers around the world in the future and to be able to serve them even better and faster.

Online customer service

Mon-Fri: (other time please reserve)

08:30 - 12:00 (Beijing time)

13:00 - 17:00 (Beijing time)

All-in-one solution

Professional solution for each project

Prompt offer with competitive price

Process every unique project for client

Formwork instructors

The Boyoun formwork in­struc­tors are spe­cial­ly trained and ex­pe­ri­enced prac­ti­tion­ers who know how to install

CERTIFICATIONS
FAQ

1. Where is your factory?

Our factory is located in Binzhou city, Shandong province, where is 350km far from Beijing, 240km far from Tianjin port. Our sales office is located in Beijing city.

2. How fast can my order be delivered?

You can state your desired Delivery date for your order. The order and the desired delivery date will be checked after your order got sent.
When you receive your order confirmation, you will find the information on your final delivery date (outgoing). We will, of course, try our best to meet the specified delivery date.

3. What's the material of your products?

Steel Q235B or Q345B.


Send your message to this supplier
Send Now

Recyclable Precast Concrete Formwork SBG System For Concrete Construction

Ask Latest Price
Place of Origin :
Shandong, China
Brand Name :
BOYOUN
Model Number :
Formwork System
Supply Ability :
60000 Ton/Tons per Year
Packaging Details :
Standard or according to your requirement
MOQ :
50 Ton/Tons
Contact Supplier
Recyclable Precast Concrete Formwork SBG System For Concrete Construction
Recyclable Precast Concrete Formwork SBG System For Concrete Construction
Recyclable Precast Concrete Formwork SBG System For Concrete Construction
Recyclable Precast Concrete Formwork SBG System For Concrete Construction

Shandong Boyoun Heavy Industries Co., Ltd.

Active Member
6 Years
beijing, beijing
Since 2006
Business Type :
Manufacturer, Trading Company, Seller
Total Annual :
1000000-30000000
Employee Number :
300~400
Certification Level :
Active Member
Contact Supplier
Submit Requirement