Arc Steel Beam For Awning, Door Frame, Advertising Board Or Other Special Design
Material Specification Datas for reference
Process method
CNC Steel plate cutting---- H Shape Forming ------ Welding By ARC Soldering Machine---- Straight/ Shape Fixing --- Joint Steel plate weld by manual--- Sand-blasting---- Paint Treatment Step----Loading Packing
Loading & Installation for reference
Loaidng in factory
Loading at the project site
Installation at job site
---What do our products can for?
Our products can do warehouse, workshop, storage shed, school, hanger shed, commercial building, high rise building, etc.
---How long can delivery?
Normally it needs around 45 days within 300 Tons when all drawing is confirmed.
---What’s the payment term?
30% deposit by TT when signing contract, 70% balance be paid by TT before shipment against final production material list.
---How to ship to job site?
Normally we use 40HQ, or 40OT.
---How about the erection?
We can provide 1 or 2 engineer supervise your erection if you need.
---Any others products can be supply?
All products about steel frame can be supplied, such as roofing sheet, wall panel, crane, door, window, down pipe and some accessories.
---Contact Information
Any questions, please contact Miss. Helen---008613712413260 --- helensun@hf-steel.com