Product Name : RS485 commnucation and RFID connector Platform Screen door System for BRT Bus station
I. Introduction
These doors help to:
PF400 Platform screen door is developed by Ivy Machinery based on North America rail sliding door technology combining with Chinese metro system environment. The design philosophy is to build simple, reliable, Environmental, and energy saving system.
Normal operation mode After the train parks within the required range, ATC system will give door opening or closing order to the central control cabinet (PSC). Then PSC gives order to individual DCU to implement the door opening and closing.
System Failure Mode In case the system control fails, the station operator can open and close the platform door using the control panel in the station control room.
Door Unit Failure mode If the individual door has mechanical or electrical problem, the platform operator can open and close door by using local key.
II. Mechanism
PF400 Platform screen door consists of :
Mechanical & Electrical system. Mechanical system includes frame structure, door operator, sliding door, fixed door, emergency door, and end door.;
Electrical system includes power supply, door control unit (DCU), central control cabinet (PSC), & network connection equipments.
III. Main Parameters
Operation Temperature | -40°C - 60°C |
Operation Voltage | DC12V or DC24V |
Motor Power | 100W |
Driving Mechanism | Leading screw |
Minimum Life Cycle | 1,000,000 |
Door Closing or Opening Time | 1.5 – 3.5 Seconds |
Style | full and half height |
IV. Product Advantage
FAQ:
Question 1: We have special requirement, can it be achieved?
We have more than 10 designers for design and help customer with their special requirement. We are happy to help customer to solve their problem with doors
Question 2: Are You a Manufactory or Trade Company?
We are a professional manufacturer and has professional international team
Question 3: Where Is Your Factory Located? How can I Visit There?
Our factory is located in Nanjing , Jiangsu China, one hour far from Shanghai by train. The production plant, research base and office block together occupy an area of 18,000 square meters.We can pick you up from Shanghai airport and then go to our factory, it takes about one hour by train. Warmly welcome you to visit our factory!
Question 4: How Many Days Will Samples Be Finished? How about The Mass Production?
We are honored to offer our existing samples to be evaluated
Sample lead time: 2 days after confirm the artwork
Production lead time: 10-15days after payment
Question 5 : When Can I Get the Price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your mail so that we will give priority to your inquiry.
Question 6: Can You do OEM Orders?
Yes, with 15 years of OEM experience, we will be extremely happy to offer OEM service. Warmly welcome your orders!
Question 7: What about Your Payment Term?
Usually we accept T/T, other methods could be negotiated.Payment of 30% needs to be made in advance , rest of the 70% payment should be made within 5 days before shipment. We can also accept Paypal and West Union .