N04400 Monel 400 Nickel Alloy seamless Pipe Incoloy 800H for Boiler
Product Description
Specifications
Nickel Alloy Pipe
1.Standard:ASTM, DIN,JIS,GB,EN
2.OD:0.5-600mm
3.Ni (Min):50%-55%
4.Lenth:2-12m
Product Name | Pipe |
Material | Nickel Alloy steel |
Place of Origin | China |
Standard | DIN GB ISO JIS BA ANSI |
Length | 6-12M |
Brade | TOBO |
MOQ | 1ton |
Technique | ERW |
Chemical Composition of N04400 Monel 400 Nickel Alloy Pipe
Element | Content |
Ni | 63 % min |
Cu | 28 - 34 % |
Fe | 2.5 % max |
Mn | 2 % max |
Chemical composition:
Alloy | % | Ni | Cr | Fe | C | Mn | Si | Cu | S | Al | Ti |
800 | Min | 30 | 19 | 39.5 |
|
|
|
|
| 0.15 | 0.15 |
Max | 35 | 23 |
| 0.1 | 1.5 | 1.0 | 0.75 | 0.015 | 0.6 | 0.6 | |
800H | Min | 30 | 19 | 39.5 | 0.05 |
|
|
|
| 0.15 | 0.15 |
Max | 35 | 23 |
| 0.1 | 1.5 | 1.0 | 0.75 | 0.015 | 0.6 | 0.6 | |
800HT | Min | 30 | 19 | 39.5 | 0.06 |
|
|
|
| 0.15 | 0.15 |
Max | 35 | 23 |
| 0.1 | 1.5 | 1.0 | 0.75 | 0.015 | 0.6 | 0.6 | |
| AI+Ti: 0.85-1.20 |
|
Product Name | Inconel800H nickel alloy seamless tube |
Material | Nickel alloy |
Standard | ASTM B829 |
Grade | N04400 Monel 400 |
Brade | TOBO |
Size | O.D 6-219mm; W.T:1-30mm |
Chemical composition | Ni: 50~55% ; Cr:17~21% ; Fe: balance;Mo:2.8~3.3% ; Nb: 4.75~5.5% ; Co: ≤1.0% ; C≤0.08% ; Mn≤0.35% ; Si≤ 0.35% ; Cu≤0.3% ; Al: 0.2~0.8% ; Ti: 0.65~1.15% ; P≤0.015% ; |
Density | 8.24 g/cm3 |
Melting range | 1260~1340℃ |
Characteristic as below | 1.workability |
Metallurgical structure | 718 alloy is Austenitic structure, precipitation hardening generate "γ" made it excellent mechanical performance. G rain boundary generate "δ" made it the best plasticity in the heat treatment. |
Corrosion resistance | 718 alloy with extremely resistance to stress corrosion cracking and pitting ability in high temperature or low temperature environments, especially the inoxidability in the high temperature. |
Application field | The elevated temperature strength, excellent corrosion resistance and workability at 700℃ properties made it use in a wide range of high requirement environments. |
Our Service
Why Choosing Metal Industrial:
-Sufficient Forging, Heating, Machining Equipment
-In-house Inspection Instruments for Quality Controlling
-Competitive Price & High Quality Assurance
-Fast, Effective and Efficient Services
-Directly supplier of Danieli Metallurgical Equipment
-Experienced Professinonals on Communication.
Our Company
1.We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicians.
2.We have five branch factories which can supply the best quality pipes, tubes, fittings flanges and related accessories. Now, it owns a number of advanced pipe production equipments, metal, forging, machining, cold forming, hot extrusion, such as heat treatment process, producing 60, 000 tons of pipe fittings. Company with a variety of detection devices, such as nondestructive testing, chemical analysis, metallographic examination, physical experiments. The technical is very strength, our main products contain fittingsforged socket welding fittings and threaded fittings, pipe weld and the materials of the products contain stainless steel ,duplex-stainless steel alloy steel.
3.In addition, we are authorized by more than 120 top-class mills from South Korea,Japan and China like JFE,SUMITOMO,POSCO,BAOSTEEL, TISCO,LISCO,.TPCO,HENGYANG VALIN and so on.
Packing&Delivery
1.Packing Details : Regular shipping packaging or depends on customer's requirement
2.Delivery Details : 7-15 days after the PO
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.